As a way to present you with ease and enlarge our enterprise, we also have inspectors in QC Workforce and assure you our greatest support and solution for dzl boiler economizer, Condensing Gas Boilers, biomass boiler chain grate, We have been in operation for more than 10 years. We are dedicated to quality products and consumer support. We invite you to visit our company for a personalized tour and advanced business guidance.
2019 Latest Design China Thermal Oil Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

2019 Latest Design China Thermal Oil Boiler - Installation & Technology Service – Double Rings detail pictures

2019 Latest Design China Thermal Oil Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We believe in: Innovation is our soul and spirit. Quality is our life. Shopper need is our God for 2019 Latest Design China Thermal Oil Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Zimbabwe, kazakhstan, Adelaide, We're introduced as a one of the growing manufacture supplier and export of our merchandise. Now we have a team of dedicated trained experienced who take care the quality and timely supply. If you are looking for Good Quality at a good price and timely delivery. Do contact us.
  • The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
    5 Stars By Ruby from Palestine - 2018.06.12 16:22
    The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By Marguerite from Afghanistan - 2017.08.21 14:13
    Write your message here and send it to us

    Related products

    • Manufacturer of Coal Fired Steam Boiler - Single Drum Hot Water Boiler – Double Rings

      Manufacturer of Coal Fired Steam Boiler - Sing...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

    • Short Lead Time for Water Tube Boilers - Pressure Vessel – Double Rings

      Short Lead Time for Water Tube Boilers - Press...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • China Steam Boiler Installation - heat recovery boiler – Double Rings

      China Steam Boiler Installation - heat recover...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • Special Design for Heating Water Boiler - Boiler Water Treatment – Double Rings

      Special Design for Heating Water Boiler - Boil...

      More photos 1. Quartz sand filter — mainly used for the removal of sediment from water. 2. Active Carbon filter– mainly used for chlorine removal and other organic gases and to clear up the taste of water . 3. Water Softener– exchange “ions” of calcium and magnesium with the most common and easiest method. 4. Precision filter– mainly used for removing microorganisms,chlorine,part of the heavy metal ions more precisely 5. High pressure pump– Provi...

    • Fixed Competitive Price Heat Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Fixed Competitive Price Heat Boilers - Coal Bo...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Super Lowest Price Oil Fueled Boiler - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

      Super Lowest Price Oil Fueled Boiler - Coal Bo...

      I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3