2020 Latest Design Biomass Boiler - Double Drum Hot Water Boiler – Double Rings
2020 Latest Design Biomass Boiler - Double Drum Hot Water Boiler – Double Rings Detail:
Parameter :
SZL Bearing Pressure Hot water Boiler
Main Technology Parameter List
ModelItem | SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII | SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII | SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII | |||
Rated Capacity | 2.8T/h | 4.2 T/h | 5.6 T/h | |||
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |||
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | |||
Feed Water Temp. ℃ | 70 | 70 | 70 | |||
Fuel Consumption Kg/H | ~580 | ~900 | ~1130 | |||
Thermal Efficiency % | 78 | 80 | 80 | |||
Heating Surface | Boiler Body m² | 80.5 | 142 | 178 | ||
Economizer m² | 38.5 | 87.2 | 122.08 | |||
Grate area m² | 4.84 | 7.78 | 10.42 | |||
Design Fule | Bituminous Coal | |||||
Max. Transport Weight | 30 T | ~25T | ~26T | |||
Max. Transport Dimension m | 6.9×2.5×3.5 | Up6.09×3.04×3.6D:7.3×2.86×1.72 | 6.9×3.33×3.55 | |||
Boiler Auxiliary Equipment Model and Specification | ||||||
Air Blower | Model | T4-72-11 4ARight 315° | T4-72-11 5ARight 225° | GC8-1Right 225° | ||
Motor Power | N=5.5 Kw | N=11 Kw | N=11 Kw | |||
Draft Fan | Model | Y9-26 9DRight 0° | Y8-39 9DRight 0° | GY8-1Right 0° | ||
Motor Power | N=22 Kw | N=30 Kw | N=37 Kw | |||
Gear Box | Model | GL-5P | GL-10P | GL-10P | ||
Motor Power | N=0.55 Kw | N=1.1Kw | N=1.1 Kw | |||
Feed Water Pump | Model | 1½ GC5x7 | 2GC-5×5 | 2GC-5×4 | ||
Motor Power | N=7.5 Kw | N=11 Kw | N=11 Kw | |||
Dust Remover | XD-4 | XD-6 | XD-8 |
ModelItem | SZL7-1.0/115/70-AIISZL7-1.25/130/70-AII | SZL10.5-1.0/115/70-AIISZL10.5-1.25/130/70-AII | SZL14-1.0/115/70-AIISZL14-1.25/130/70-AII | SZL17.5-1.0/115/70-AIISZL17.5-1.25/130/70-AII | |
Rated Capacity | 7T/h | 10.5 T/h | 14 T/h | 17.5T/h | |
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | 115/130 | |
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | |
Fuel Consumption Kg/H | ~1400 | ~1900 | ~2700 | ~3650 | |
Thermal Efficiency % | 82 | 82 | 82 | 82 | |
Heating Surface m² | Radiation Tube | 39.43 | 37.21 | 58.4 | 58.4/68.4 |
convection bank | 213.4 | 284.68 | 307.4 | 307.4/384.8 | |
Economizer m² | 122.08 | 130.8 | 413 | 413/521 | |
Grate area m² | 11.99 | 17.81 | 22.56 | 24.52 | |
Design Fule | Bituminous Coal (Low location of heat value:19228Ki/kg) | ||||
Max. Transport Weight | ~40 T | ~43T | ~30T | ~30T | |
Max. Transport Dimension | 7.9×3.2×3.5 | 10×3.2×3.5 | 11×3.2×3.5 | 12×3.2×3.54 |
Product detail pictures:
Related Product Guide:
Boiler Structure
We aim to find out quality disfigurement from the production and supply the best service to domestic and overseas customers wholeheartedly for 2020 Latest Design Biomass Boiler - Double Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Hamburg, Italy, Jamaica, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and good service for domestic and international customers.
By Sarah from Paraguay - 2018.12.05 13:53
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
By Hedda from Cairo - 2018.02.04 14:13
Write your message here and send it to us