2020 Latest Design Electric Hot Water Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings
2020 Latest Design Electric Hot Water Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings Detail:
Quality Control
1 | Strength Calculation Report for Applied Materials after Inspection Machine inspected. |
2 | 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; |
3 | 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; |
4 | Hydraulic test report:ensure the standard working pressure and safety; |
5 | Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province |
6 | Manufacturer Produce Level Grade-A. Product Reach European Standard CE Marks. |
Product detail pictures:
Related Product Guide:
Boiler Structure
Our corporation has been specializing in brand strategy. Customers' gratification is our greatest advertising. We also source OEM company for 2020 Latest Design Electric Hot Water Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings , The product will supply to all over the world, such as: Southampton, Los Angeles, Cyprus, We are adhering to the philosophy of "attracting customers with the best products and excellent service". We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
By Candy from Victoria - 2017.02.18 15:54
We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
By Janet from Sri Lanka - 2017.06.25 12:48
Write your message here and send it to us