Biomass Fired Boiler Pricelist - Single Drum Hot Water Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

With the "Client-Oriented" business philosophy, a rigorous quality control system, advanced manufacturing equipment and a strong R&D team, we always provide high quality products, excellent services and competitive prices for boiler old fired, autoclave sterilization temperature, autoclave industrial, We welcome all of the purchasers and pals to contact us for mutual added benefits. Hope to do additional business enterprise along with you.
Biomass Fired Boiler Pricelist - Single Drum Hot Water Boiler – Double Rings Detail:

Parameter :

DZG(L)Bearing Pressure Hot water boiler

Main Technology Parameter List

Model DZG0.7-0.7/95/70
DZL0.7-0.7/95/70 
DZG1.4-0.7/95/70
DZL1.4-0.7/95/70
DZL1.4-1.0/115/70
DZL28-1.0/115/70
DZL2.8-1.25/130/70
DZL4.2-1.0/115/70
DZL4.2-1.25/130/70
Rated Capacity T/h 0.7 1.4 2.8 4.2
Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25
Rated Steam Temp. 95 95/115 115/130 115/130
Feed Water Temp. 70 70 70 70
Fuel Consumption  Kg/H ~150 ~310 ~590 ~900
Thermal Efficiency  % 75 78 79 77.44
Heating Surface Boiler Body  32.4 33.85 75.75 142
Economizer  24.64 38.5 87.2
Grate area   m² 1.4/2.05 2.3/3.5 4.66 7.4
Designed Fuel  Type Bituminous Coal Bituminous Coal Bituminous Coal Bituminous Coal
Max. Transport Weight  T ~16 ~21 ~26.5 ~30
Max. Transport Dimension  m 4.3×2.25×2.955.26×2.25×2.95 5.1×2.2×3.35.9×2.2×3.3 6.5×2.6×3.5 6.01×3.4×3.57.29×2.9×1.7
Boiler Auxiliary Equipment Model and Specification
Air Blower Model T4-72-11;3.2A Right T4-72-11;3.5A Right T4-72-11;4A Right T4-72-11;5A  Right
Motor Power N=1.5 Kw N=3 Kw N=5.5 Kw N=11 Kw
Draft Fan Model YX9-355C ; Right 0° Y-9-26;6.3C ; Right 0° Y-9-26;9D;Right 0° Y8-399D;Ring 0°
Motor Power N=5.5 Kw N=11 Kw N=22 Kw N=30 Kw
Gear Box Model GL-5P GL-5P GL-5P GL-10P
Motor Power N=0.55 Kw N=0.55 Kw N=0.55 Kw N=1.1Kw
Feed Water Pump Model 1.5WCT-120 1.5WCT-120 1½ GC5x5 2GC5x4
Motor Power N=2.2 Kw N=2.2Kw N=5.5 Kw N=11 Kw
Dust Remover Model XD-1 XD-2 XD-4 XD-6

 

ModelItem DZL7-1.0/115/70 DZL14-1.0/115/70 DZL29-1.25/130/70 DZL46-1.25/130/70 DZL58-1.25/130/70 DZL70-1.25/130/70
Rated Capacity T/h 7 14 29 46 58 70
Rated Working Pressure Mpa 1.0 1.0 1.25 1.25 1.25 1.25
Rated Steam Temp. 115 115 130 130 130 130
Feed Water Temp. 70 70 70 70 70 70
Heating AreaBoiler Body 228.6 434.7 Radiation:73.07Convection:903.01 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5
Grate area   m² 11.5 22.5 34.5 57.8 77 91
FuelKj/Kg Coal  Class II Bituminous Coal
Low heat 18757 17693
Fuel Consumption Kg/h ~1440 ~2700 ~6610 ~10500 ~12800 ~15300
Thermal Efficiency  % 80 80 82.5 82.05 83.03 83.28
Max. Transport Weight  Ton 35 28 19.68 28.796 31 31

Product detail pictures:

Biomass Fired Boiler Pricelist - Single Drum Hot Water Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our enhancement depends around the sophisticated devices ,exceptional talents and repeatedly strengthened technology forces for Biomass Fired Boiler Pricelist - Single Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Nepal, Moscow, Seychelles, As an experienced manufacturer we also accept customized order and we could make it the same as your picture or sample specification. The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
  • This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Myrna from Amsterdam - 2018.06.18 17:25
    This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Pearl from Uganda - 2018.08.12 12:27
    Write your message here and send it to us

    Related products

    • China Steam Boiler Electric Manufacturers - LPG Pressure Tank – Double Rings

      China Steam Boiler Electric Manufacturers - LP...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • China Boiler Accessory Factories - Wood Biomass Boiler – Double Rings

      China Boiler Accessory Factories - Wood Biomas...

      Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory

    • OEM/ODM Factory Industrial Biomass Boilers - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      OEM/ODM Factory Industrial Biomass Boilers - C...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • Wholesale Price China Steam Generator Boiler - Installation & Technology Service – Double Rings

      Wholesale Price China Steam Generator Boiler -...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Free sample for Hot Water Heating Boilers - Installation & Technology Service – Double Rings

      Free sample for Hot Water Heating Boilers - In...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Reasonable price Wood Chip Biomass Boiler - Electric Steam Boiler – Double Rings

      Reasonable price Wood Chip Biomass Boiler - El...

      Introduction: Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃ Feature Fully automatic operation can be realized by a digital controller switch Control system selected advanced programmable controller, heating element input sequence can be realized the timing automatically switches to extend component life With automatic sewage With automatic wa...