Instruction
DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined with efficient water film dust collector make the ash to meet the requirements of Class A.
The series coking boiler can reach the environmental effects of the gas boiler by burning bituminous coal cost , environmental protection and energy saving.
Parameter :
DZH Coking coil boiler
Main Technology Parameter List
Model | DZH1-0.7-T | DZH2-1.25 | DZH4-1.25-T | DZH6-1.25-T | DZH8-1.25-T | DZH10-1.25-T | ||
Rated Capacity | 1 T/h | 2 T/h | 4 T/h | 6 T/h | 8 T/h | 10 T/h | ||
Rated Working Pressure | 0.7 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | ||
Rated Steam Temp. ℃ | 171 | 194 | 194 | 194 | 194 | 194 | ||
Feed Water Temp. ℃ | 20 | |||||||
Heating Surface | Boiler Body m² | 25.27 | 33.85 | 76 | 142 | 160 | 207 | |
Economizer m² | 17.7 | 35.4 | 59 | 87.2 | 122.08 | 140 | ||
Grate area m² | 1.97 | 2.68 | 3.97 | 6.9 | 7.4 | 9.2 | ||
Design Fule | Metallurgical coke ,foundry coke I II | |||||||
Fuel Consumption Kg/H | ~120 | ~230 | ~475 | ~665 | ||||
Thermal Efficiency % | 76 | 78 | 78 | 78 | 79 | 80 | ||
Max. Transport Weight | ~9 T | ~14.5T | ~21T | ~25T | ~30T | ~20T | ||
Max. Transport Dimension | 3.95×1.9×2.6 | 4.2×2.7×3.0 | 5.8×2.8×3.2 | 6.57×2.75×3.45 | 7.1×3.2×3.5 | 7.6×3.2×3.5 | ||
Finished boiler size m | 3.95×1.9×2.68 | 4.2×2.9×4.2 | 5.8×3.5×4.4 | 6.6x3x3.6 | 7.2x4x4.2 | 7.7×4.1×4.5 | ||
Boiler Auxiliary Equipment Model and Specification | ||||||||
Air Blower | Model | Y6-30-12Left 90° | YX-9-35Left 90° | YX9-35Right 0° | GY6-1Right 0° | 10TYRight 0° | 10TYRight 0° | |
Motor Power | N=4 Kw | N=7.5 Kw | N=18.5 Kw | N=30 Kw | N=45 Kw | N=45 Kw | ||
Draft Fan | Model | T4-72 Right 0° | T4-72 Right 315° | T4-72 Right 315° | GG6-1Right 225° | 10TGRight 225° | 10TGRight 225° | |
Motor Power | N=1.1 Kw | N=2.2 Kw | N=5.5 Kw | N=7.5 Kw | N=14 Kw | N=15 Kw | ||
Feed Water Pump | Model | W vortex | 1½ GC5x7 | 1½ GC5x7 | DG6-25×6 | DG12-25×6 | DG12-25×7 | |
Motor Power | N=3 Kw | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=11 Kw | N=15 Kw | ||
Dust Remover | Water Film Dust Remover |
Product detail pictures:
Related Product Guide:
Boiler Structure
Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, trust the first and management the advanced" for Biomass Steam Boiler Manufacturing Enterprise - Coke Boiler – Double Rings , The product will supply to all over the world, such as: Australia, Swansea, United States, Honest to every customers are our requested! First-class serve, best quality, best price and fastest delivery date is our advantage! Give every customers good serve is our tenet! This makes our company get the favour of customers and support! Welcome all over the world customers send us enquiry and looking forward your good co-operation !Make sure you your inquiry for more details or request for dealership in selected regions.
By Eve from Georgia - 2018.05.13 17:00
The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
By Nana from Vietnam - 2018.12.22 12:52