Boiler Installation Material Factories - Double Drum Hot Water Boiler – Double Rings
Boiler Installation Material Factories - Double Drum Hot Water Boiler – Double Rings Detail:
Parameter :
SZL Bearing Pressure Hot water Boiler
Main Technology Parameter List
ModelItem | SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII | SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII | SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII | |||
Rated Capacity | 2.8T/h | 4.2 T/h | 5.6 T/h | |||
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |||
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | |||
Feed Water Temp. ℃ | 70 | 70 | 70 | |||
Fuel Consumption Kg/H | ~580 | ~900 | ~1130 | |||
Thermal Efficiency % | 78 | 80 | 80 | |||
Heating Surface | Boiler Body m² | 80.5 | 142 | 178 | ||
Economizer m² | 38.5 | 87.2 | 122.08 | |||
Grate area m² | 4.84 | 7.78 | 10.42 | |||
Design Fule | Bituminous Coal | |||||
Max. Transport Weight | 30 T | ~25T | ~26T | |||
Max. Transport Dimension m | 6.9×2.5×3.5 | Up6.09×3.04×3.6D:7.3×2.86×1.72 | 6.9×3.33×3.55 | |||
Boiler Auxiliary Equipment Model and Specification | ||||||
Air Blower | Model | T4-72-11 4ARight 315° | T4-72-11 5ARight 225° | GC8-1Right 225° | ||
Motor Power | N=5.5 Kw | N=11 Kw | N=11 Kw | |||
Draft Fan | Model | Y9-26 9DRight 0° | Y8-39 9DRight 0° | GY8-1Right 0° | ||
Motor Power | N=22 Kw | N=30 Kw | N=37 Kw | |||
Gear Box | Model | GL-5P | GL-10P | GL-10P | ||
Motor Power | N=0.55 Kw | N=1.1Kw | N=1.1 Kw | |||
Feed Water Pump | Model | 1½ GC5x7 | 2GC-5×5 | 2GC-5×4 | ||
Motor Power | N=7.5 Kw | N=11 Kw | N=11 Kw | |||
Dust Remover | XD-4 | XD-6 | XD-8 |
ModelItem | SZL7-1.0/115/70-AIISZL7-1.25/130/70-AII | SZL10.5-1.0/115/70-AIISZL10.5-1.25/130/70-AII | SZL14-1.0/115/70-AIISZL14-1.25/130/70-AII | SZL17.5-1.0/115/70-AIISZL17.5-1.25/130/70-AII | |
Rated Capacity | 7T/h | 10.5 T/h | 14 T/h | 17.5T/h | |
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | 115/130 | |
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | |
Fuel Consumption Kg/H | ~1400 | ~1900 | ~2700 | ~3650 | |
Thermal Efficiency % | 82 | 82 | 82 | 82 | |
Heating Surface m² | Radiation Tube | 39.43 | 37.21 | 58.4 | 58.4/68.4 |
convection bank | 213.4 | 284.68 | 307.4 | 307.4/384.8 | |
Economizer m² | 122.08 | 130.8 | 413 | 413/521 | |
Grate area m² | 11.99 | 17.81 | 22.56 | 24.52 | |
Design Fule | Bituminous Coal (Low location of heat value:19228Ki/kg) | ||||
Max. Transport Weight | ~40 T | ~43T | ~30T | ~30T | |
Max. Transport Dimension | 7.9×3.2×3.5 | 10×3.2×3.5 | 11×3.2×3.5 | 12×3.2×3.54 |
Product detail pictures:
Related Product Guide:
Boiler Structure
It truly is our responsibility to fulfill your requirements and successfully provide you. Your fulfillment is our best reward. We're seeking forward in your check out for joint development for Boiler Installation Material Factories - Double Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Barcelona, Netherlands, Hanover, Since the establishment of our company, we've realized the importance of providing good quality goods and the best before-sales and after-sales services. Most problems between global suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question points they do not understand. We break down these barriers to ensure you get what you want to the level you expect, when you want it.
By Sandra from Niger - 2017.06.16 18:23
The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
By May from Angola - 2017.08.18 11:04
Write your message here and send it to us