Boilers Wholesale Prices - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Our commission would be to serve our customers and clientele with very best excellent and aggressive portable digital products for coal boiler F.D fan, High Efficiency Gas Boiler, Heating Water Boiler, We are sincerely on the lookout ahead to cooperate with buyers everywhere in the entire world. We imagine we will satisfy along with you. We also warmly welcome consumers to visit our manufacturing unit and purchase our items.
Boilers Wholesale Prices - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings Detail:

Introduction:

As a new type of mature high-performance with low-pollution clean coal technology.
circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics.
1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfurization rate is economical.
2. Circulating fluidized bed boiler could adopt various coal types and has high combustion efficiency, which is especially suitable for low quality, low calorific value coal.
3.The ash of circulating fluidized bed boiler is of high activity, thus it is easy to realize comprehensive utilization without secondary pollution.
4.Circulating fluidized bed boiler could adjust its load in a wide range. Lowest load can be reduced to 30% Of full capacity.
Our recommendation—the of low magnification circulating fluidized bed boiler products have completely solved the problems like boiler abrasion, slagging and ash blocking of feed recycle device.original emission concentration of boiler and deslagging. Now the requirement on environmental protection is increasingly strict.As raw coal’s proportion of direct-fired is high. which makes the contradiction between coal and environmental protection more and more acute. Under such background, circulating fluidized bed boiler with the features of environmental protection and energy saving is your best choice.

Quality Control

1 Strength Calculation Report for Applied Materials after Inspection Machine inspected.
2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod;
3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler;
4 Hydraulic test report:ensure the standard working pressure and safety;
5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province
6 Manufacturer Produce Level  Grade-A.  Product Reach European Standard CE Marks.

Inspection Machinery for the Boiler in Workshop and Laboratory :

No. Name Model Qty
1 Digital Carbon & Sulfur Analysis Meter HV-4B 1set
2 High Speed Self-Ignition Furnace HB-2H 1set
3 Electric Scale JA1003 1set
4 Photometer 723 1set
5 Metallography Scale XJB-2A 1set
6 Hydraulic Multi-propose Test Machinery WE-100 1set
7 WE-600A 1set
8 Concussion Testing Machine JB-30 1set
9 Projective Meter JS 1set
10 X Ray Crack Detector XXH3005 1set
11 XXH2505 XXXXH23005 2sets
12 XY2515 2sets
13 Ultrasonic Crack Detector CTS-22 2sets

Product detail pictures:

Boilers Wholesale Prices - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We stay with the basic principle of "quality initially, services first, steady improvement and innovation to fulfill the customers" for your management and "zero defect, zero complaints" as the quality objective. To perfect our company, we give the goods while using the good high-quality at the reasonable selling price for Boilers Wholesale Prices - SZS Fulverized Coal Steam Boiler Hot water boiler – Double Rings , The product will supply to all over the world, such as: Bandung, Azerbaijan, Hamburg, Due to our good goods and services, we've received good reputation and credibility from local and international customers. If you will need more information and are interested in any of our solutions, be sure to feel free to contact us. We look forward to becoming your supplier in the near future.
  • The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.
    5 Stars By Prima from Croatia - 2017.09.09 10:18
    Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Mignon from Plymouth - 2018.06.30 17:29
    Write your message here and send it to us

    Related products

    • Cheap PriceList for Best Oil Fired Boilers - Boiler Water Tank – Double Rings

      Cheap PriceList for Best Oil Fired Boilers - B...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...

    • China Biomass Heating Factories - Wood Biomass Boiler – Double Rings

      China Biomass Heating Factories - Wood Biomass...

      Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory

    • Super Lowest Price Oil Fueled Boiler - Installation & Technology Service – Double Rings

      Super Lowest Price Oil Fueled Boiler - Install...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • OEM Supply Diesel Steam Boiler - Biomass Hot Water Boiler – Double Rings

      OEM Supply Diesel Steam Boiler - Biomass Hot W...

      Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...

    • Bottom price Industrial Hot Water Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings

      Bottom price Industrial Hot Water Boiler - Coa...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Well-designed Biomass Pellet Boiler - Installation & Technology Service – Double Rings

      Well-designed Biomass Pellet Boiler - Installa...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...