Cheapest Price Biomass Boiler Cost - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

With advanced technologies and facilities, strict quality control, reasonable price, superior service and close co-operation with customers, we are devoted to providing the best value for our customers for rice husk steam boiler, Industrial Biomass BoilerCommercial Biomass BoilersBiomass Steam BoilerBiomass Pellet BoilerWood Chip Biomass BoilerWood Pellet BoilerBiomass Fired BoilerChina Biomass Boiler, power plant boilersupercritical boilerboiler in thermal power planttypes of boilers in power plantboiler in steam power plantCFB boiler, We invites you and your company to thrive together with us and share a dazzling foreseeable future in world-wide market place.
Cheapest Price Biomass Boiler Cost - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Cheapest Price Biomass Boiler Cost - Installation & Technology Service – Double Rings detail pictures

Cheapest Price Biomass Boiler Cost - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With state-of-the-art technologies and facilities, strict good quality regulate, reasonable cost, exceptional assistance and close co-operation with prospects, we're devoted to supplying the top benefit for our customers for Cheapest Price Biomass Boiler Cost - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: India, Romania, Cannes, We guarantee that our company will try our best to reduce customer purchase cost , shorten the period of purchase , stable products quality , increase customers' satisfaction and achieve win-win situation .
  • As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
    5 Stars By Yannick Vergoz from UAE - 2018.06.19 10:42
    Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
    5 Stars By Julie from Doha - 2018.09.29 13:24
    Write your message here and send it to us

    Related products

    • Online Exporter Boiler Industry - Coal Boiler Economizer – Double Rings

      Online Exporter Boiler Industry - Coal Boiler ...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • China Supplier Steam Tube - Gas Oil Thermal Oil Boiler – Double Rings

      China Supplier Steam Tube - Gas Oil Thermal Oi...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • Low price for Biomass Steam Boiler - SHF Coal Water Slury Steam Boiler – Double Rings

      Low price for Biomass Steam Boiler - SHF Coal ...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • Fast delivery Boiler Accessory - Coal Boiler Biomass Boiler F.D.Fan – Double Rings

      Fast delivery Boiler Accessory - Coal Boiler B...

      FD Fan used in Coal Boiler Industrial centrifugal blower fan is used for steam boilers, which has good quality and high efficiency. According to your requirements, we can provide technical solution and technical solution. Below industrial blower fan picture for your reference.

    • Factory source Coal Fired Boiler - Gas oil Boiler Economizer – Double Rings

      Factory source Coal Fired Boiler - Gas oil Boi...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

    • Bottom price Coal Boiler - Boiler Ladder and Stair – Double Rings

      Bottom price Coal Boiler - Boiler Ladder and S...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...