China Biomass Heating Suppliers - Double Drum Hot Water Boiler – Double Rings
China Biomass Heating Suppliers - Double Drum Hot Water Boiler – Double Rings Detail:
Parameter :
SZL Bearing Pressure Hot water Boiler
Main Technology Parameter List
ModelItem | SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII | SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII | SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII | |||
Rated Capacity | 2.8T/h | 4.2 T/h | 5.6 T/h | |||
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |||
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | |||
Feed Water Temp. ℃ | 70 | 70 | 70 | |||
Fuel Consumption Kg/H | ~580 | ~900 | ~1130 | |||
Thermal Efficiency % | 78 | 80 | 80 | |||
Heating Surface | Boiler Body m² | 80.5 | 142 | 178 | ||
Economizer m² | 38.5 | 87.2 | 122.08 | |||
Grate area m² | 4.84 | 7.78 | 10.42 | |||
Design Fule | Bituminous Coal | |||||
Max. Transport Weight | 30 T | ~25T | ~26T | |||
Max. Transport Dimension m | 6.9×2.5×3.5 | Up6.09×3.04×3.6D:7.3×2.86×1.72 | 6.9×3.33×3.55 | |||
Boiler Auxiliary Equipment Model and Specification | ||||||
Air Blower | Model | T4-72-11 4ARight 315° | T4-72-11 5ARight 225° | GC8-1Right 225° | ||
Motor Power | N=5.5 Kw | N=11 Kw | N=11 Kw | |||
Draft Fan | Model | Y9-26 9DRight 0° | Y8-39 9DRight 0° | GY8-1Right 0° | ||
Motor Power | N=22 Kw | N=30 Kw | N=37 Kw | |||
Gear Box | Model | GL-5P | GL-10P | GL-10P | ||
Motor Power | N=0.55 Kw | N=1.1Kw | N=1.1 Kw | |||
Feed Water Pump | Model | 1½ GC5x7 | 2GC-5×5 | 2GC-5×4 | ||
Motor Power | N=7.5 Kw | N=11 Kw | N=11 Kw | |||
Dust Remover | XD-4 | XD-6 | XD-8 |
ModelItem | SZL7-1.0/115/70-AIISZL7-1.25/130/70-AII | SZL10.5-1.0/115/70-AIISZL10.5-1.25/130/70-AII | SZL14-1.0/115/70-AIISZL14-1.25/130/70-AII | SZL17.5-1.0/115/70-AIISZL17.5-1.25/130/70-AII | |
Rated Capacity | 7T/h | 10.5 T/h | 14 T/h | 17.5T/h | |
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | 115/130 | |
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | |
Fuel Consumption Kg/H | ~1400 | ~1900 | ~2700 | ~3650 | |
Thermal Efficiency % | 82 | 82 | 82 | 82 | |
Heating Surface m² | Radiation Tube | 39.43 | 37.21 | 58.4 | 58.4/68.4 |
convection bank | 213.4 | 284.68 | 307.4 | 307.4/384.8 | |
Economizer m² | 122.08 | 130.8 | 413 | 413/521 | |
Grate area m² | 11.99 | 17.81 | 22.56 | 24.52 | |
Design Fule | Bituminous Coal (Low location of heat value:19228Ki/kg) | ||||
Max. Transport Weight | ~40 T | ~43T | ~30T | ~30T | |
Max. Transport Dimension | 7.9×3.2×3.5 | 10×3.2×3.5 | 11×3.2×3.5 | 12×3.2×3.54 |
Product detail pictures:
Related Product Guide:
Boiler Structure
"Based on domestic market and expand overseas business" is our development strategy for China Biomass Heating Suppliers - Double Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Paris, Monaco, Oslo, Taking the core concept of "to be the Responsible". We'll redound up on society for high quality merchandise and good service. We will initiative to participate in international competition to be a first- class manufacturer of this product in the world.
By Jo from Jakarta - 2017.11.01 17:04
It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
By Charlotte from Jeddah - 2017.12.02 14:11
Write your message here and send it to us