Our products are broadly regarded and reliable by end users and can meet up with constantly transforming financial and social requires of Water Gas Boiler, Chinese Boiler meter, biomass boiler reducer, We welcome new and aged buyers from all walks of daily life to get hold of us for upcoming business enterprise interactions and acquiring mutual good results!
China Boiler Wood Factory - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

"Sincerity, Innovation, Rigorousness, and Efficiency" could be the persistent conception of our enterprise to the long-term to produce together with clients for mutual reciprocity and mutual profit for China Boiler Wood Factory - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Slovak Republic, Barcelona, Denmark, We set "be a creditable practitioner to achieve the continuous development and innovation" as our motto. We would like to share our experience with friends at home and abroad, as a way to create a bigger cake with our joint efforts. We have several experienced R & D persons and we welcome OEM orders.
This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
5 Stars By Karen from Iran - 2017.08.21 14:13
The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
5 Stars By Mavis from Paraguay - 2017.08.18 18:38
Write your message here and send it to us

Related products

  • China Boiler Tube Factories - Boiler Ladder and Stair – Double Rings

    China Boiler Tube Factories - Boiler Ladder an...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

  • China OEM Natural Gas Hot Water Boiler - Coal Fired Thermal Oil Boiler – Double Rings

    China OEM Natural Gas Hot Water Boiler - Coal ...

    Introduction Thermol Oil boiler uses coal, heavy oil, light oil, combustible gas and other combustible materials as fuel, heat transfer oil as the heat carrier, and uses a circulating oil pump to force a liquid phase to circulate. After the heat energy is transferred to the heating equipment, it is then returned to reheat. Direct current special industrial furnace, heat transfer oil, also known as organic heat carrier or heat medium oil, has been used as an intermediate heat transfer me...

  • 2019 Latest Design China Thermal Oil Boiler - Coal Fired Thermal Oil Boiler – Double Rings

    2019 Latest Design China Thermal Oil Boiler - ...

    Introduction Thermol Oil boiler uses coal, heavy oil, light oil, combustible gas and other combustible materials as fuel, heat transfer oil as the heat carrier, and uses a circulating oil pump to force a liquid phase to circulate. After the heat energy is transferred to the heating equipment, it is then returned to reheat. Direct current special industrial furnace, heat transfer oil, also known as organic heat carrier or heat medium oil, has been used as an intermediate heat transfer me...

  • Biomass Boiler - Coke Boiler – Double Rings

    Biomass Boiler - Coke Boiler – Double Rings

    Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

  • Factory Price Commercial Boiler - Vertical Gas Oil Boiler – Double Rings

    Factory Price Commercial Boiler - Vertical Gas...

    Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

  • Special Price for Hot Oil Boiler - Wood Biomass Boiler – Double Rings

    Special Price for Hot Oil Boiler - Wood Biomas...

    Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory