China Electricity Boiler - Coke Boiler – Double Rings
China Electricity Boiler - Coke Boiler – Double Rings Detail:
Instruction
DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined with efficient water film dust collector make the ash to meet the requirements of Class A.
The series coking boiler can reach the environmental effects of the gas boiler by burning bituminous coal cost , environmental protection and energy saving.
Parameter :
DZH Coking coil boiler
Main Technology Parameter List
Model | DZH1-0.7-T | DZH2-1.25 | DZH4-1.25-T | DZH6-1.25-T | DZH8-1.25-T | DZH10-1.25-T | ||
Rated Capacity | 1 T/h | 2 T/h | 4 T/h | 6 T/h | 8 T/h | 10 T/h | ||
Rated Working Pressure | 0.7 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | 1.25 Mpa | ||
Rated Steam Temp. ℃ | 171 | 194 | 194 | 194 | 194 | 194 | ||
Feed Water Temp. ℃ | 20 | |||||||
Heating Surface | Boiler Body m² | 25.27 | 33.85 | 76 | 142 | 160 | 207 | |
Economizer m² | 17.7 | 35.4 | 59 | 87.2 | 122.08 | 140 | ||
Grate area m² | 1.97 | 2.68 | 3.97 | 6.9 | 7.4 | 9.2 | ||
Design Fule | Metallurgical coke ,foundry coke I II | |||||||
Fuel Consumption Kg/H | ~120 | ~230 | ~475 | ~665 | ||||
Thermal Efficiency % | 76 | 78 | 78 | 78 | 79 | 80 | ||
Max. Transport Weight | ~9 T | ~14.5T | ~21T | ~25T | ~30T | ~20T | ||
Max. Transport Dimension | 3.95×1.9×2.6 | 4.2×2.7×3.0 | 5.8×2.8×3.2 | 6.57×2.75×3.45 | 7.1×3.2×3.5 | 7.6×3.2×3.5 | ||
Finished boiler size m | 3.95×1.9×2.68 | 4.2×2.9×4.2 | 5.8×3.5×4.4 | 6.6x3x3.6 | 7.2x4x4.2 | 7.7×4.1×4.5 | ||
Boiler Auxiliary Equipment Model and Specification | ||||||||
Air Blower | Model | Y6-30-12Left 90° | YX-9-35Left 90° | YX9-35Right 0° | GY6-1Right 0° | 10TYRight 0° | 10TYRight 0° | |
Motor Power | N=4 Kw | N=7.5 Kw | N=18.5 Kw | N=30 Kw | N=45 Kw | N=45 Kw | ||
Draft Fan | Model | T4-72 Right 0° | T4-72 Right 315° | T4-72 Right 315° | GG6-1Right 225° | 10TGRight 225° | 10TGRight 225° | |
Motor Power | N=1.1 Kw | N=2.2 Kw | N=5.5 Kw | N=7.5 Kw | N=14 Kw | N=15 Kw | ||
Feed Water Pump | Model | W vortex | 1½ GC5x7 | 1½ GC5x7 | DG6-25×6 | DG12-25×6 | DG12-25×7 | |
Motor Power | N=3 Kw | N=7.5 Kw | N=7.5 Kw | N=7.5 Kw | N=11 Kw | N=15 Kw | ||
Dust Remover | Water Film Dust Remover |
Product detail pictures:
Related Product Guide:
Boiler Structure
We stick with the theory of "quality first, company first, steady improvement and innovation to satisfy the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our provider, we deliver the items together with the fantastic good quality at the reasonable value for China Electricity Boiler - Coke Boiler – Double Rings , The product will supply to all over the world, such as: Brazil, Nigeria, Puerto Rico, Our company always committed to meet your quality demand, price points and sales target. Warmly welcome you open the boundaries of communication. It is our great pleasure to service you if you need a trusted supplier and value information.
By Judith from kazakhstan - 2017.09.22 11:32
The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
By Cora from South Africa - 2018.09.16 11:31