"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization to the long-term to build together with shoppers for mutual reciprocity and mutual advantage for szs structure boiler, boiler accessory stair, New Boiler, We have expanded our business into Germany, Turkey, Canada, U. S. A. , Indonesia, India, Nigeria, Brazil and some other regions of the world. We are working hard to be one of the best global suppliers.
China Gas Fired Boiler Manufacturers - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

We insist on offering good quality generation with very good business enterprise concept, honest income as well as best and fast assistance. it will bring you not only the premium quality product or service and huge profit, but probably the most significant is usually to occupy the endless market for China Gas Fired Boiler Manufacturers - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Ecuador, Mauritius, Nepal, Now, with the development of internet, and the trend of internationalization, we have decided to extend business to overseas market. With the propose of bringing more profits to oversea customers by providing directly abroad. So we have changed our mind, from home to abroad, hope to give our customers more profit, and looking forward to more chance to make business.
The factory workers have a good team spirit, so we received high quality products fast, in addition, the price is also appropriate, this is a very good and reliable Chinese manufacturers.
5 Stars By Ivan from Curacao - 2017.07.28 15:46
The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
5 Stars By Hellyngton Sato from Las Vegas - 2018.10.01 14:14
Write your message here and send it to us

Related products

  • China Wood Pellet Boiler Suppliers - SHL Bulk Industrial Boiler – Double Rings

    China Wood Pellet Boiler Suppliers - SHL Bulk ...

    Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

  • New Fashion Design for Commercial Biomass Boilers - Coke Boiler – Double Rings

    New Fashion Design for Commercial Biomass Boile...

    Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

  • Hot-selling Commercial Biomass Boilers - Pellets Shells Husk Biomass Boiler – Double Rings

    Hot-selling Commercial Biomass Boilers - Pelle...

    Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

  • Wholesale Gas Boilers - Vertical Wood /Coal Boiler – Double Rings

    Wholesale Gas Boilers - Vertical Wood /Coal Bo...

    Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

  • Stoker Boiler Supplier - AAC Autoclave and Boiler – Double Rings

    Stoker Boiler Supplier - AAC Autoclave and Boi...

    Autoclave Characteristics 1 The autoclave is steel horizontal tube-type device, the autoclave lid is pressed by the whole block 16MnR steel, the flange of autoclave body and autoclave lid is used the 16Mn steel in the whole forging processing. The weld parts have been heat treatment and strict nondestructive testing in accordance with relevant standards. 2. Autoclave door is activity Open structure by hand-reducer. The clients can also choice the electric, pneumatic, hydraulic style to ...

  • Biomass Boiler Factories - Single Drum Steam Boiler – Double Rings

    Biomass Boiler Factories - Single Drum Steam B...

    Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...