We are also specializing in improving the things management and QC method in order that we could retain terrific edge inside the fiercely-competitive small business for Biomass Fired Boiler, boiler accessory dust cleaner, vertical coal boiler, Customers' benefit and satisfaction are always our biggest goal. Please contact us. Give us a chance, give you a surprise.
China Hot Water Pipe Manufacturer - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

We've our have sales staff, style and design staff, technical crew, QC team and package workforce. We've strict excellent control procedures for each system. Also, all of our workers are experienced in printing field for China Hot Water Pipe Manufacturer - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Salt Lake City, UK, Oslo, Our company has always insisted on the business principle of "Quality, Honest, and Customer First" by which we have won the trust of clients both from at home and abroad. If you are interested in our solutions, you should do not hesitate to contact us for further information.
This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
5 Stars By Andrea from Uruguay - 2017.12.19 11:10
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
5 Stars By Jocelyn from Japan - 2017.09.29 11:19
Write your message here and send it to us

Related products

  • Wholesale Steam Tube Boiler - Autoclave and Boiler – Double Rings

    Wholesale Steam Tube Boiler - Autoclave and Bo...

    Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...

  • High reputation Industrial Gas Boiler - Coal Fired Thermal Oil Boiler – Double Rings

    High reputation Industrial Gas Boiler - Coal F...

    Introduction Thermol Oil boiler uses coal, heavy oil, light oil, combustible gas and other combustible materials as fuel, heat transfer oil as the heat carrier, and uses a circulating oil pump to force a liquid phase to circulate. After the heat energy is transferred to the heating equipment, it is then returned to reheat. Direct current special industrial furnace, heat transfer oil, also known as organic heat carrier or heat medium oil, has been used as an intermediate heat transfer me...

  • Super Purchasing for Biomass Steam Boiler - Coal Boiler Biomass Boiler Slag Remover – Double Rings

    Super Purchasing for Biomass Steam Boiler - Co...

    Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

  • Biomass Steam Boilers Manufacturers - SZS Gas Oil PLG Boiler – Double Rings

    Biomass Steam Boilers Manufacturers - SZS Gas ...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

  • Oil Fired Boiler Manufacturers - SHF Coal Water Slury Steam Boiler – Double Rings

    Oil Fired Boiler Manufacturers - SHF Coal Wate...

    Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

  • Excellent quality Industrial Boiler Ltd - Coal Boiler Biomass Boiler F.D.Fan – Double Rings

    Excellent quality Industrial Boiler Ltd - Coal...

    FD Fan used in Coal Boiler Industrial centrifugal blower fan is used for steam boilers, which has good quality and high efficiency. According to your requirements, we can provide technical solution and technical solution. Below industrial blower fan picture for your reference.