Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for China Industrial Boiler Suppliers - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Libya, Hongkong, belarus, "Make the women more attractive "is our sales philosophy. "Being customers' trusted and preferred brand supplier" is the goal of our company. We are strict with every part of our work. We sincerely welcome friends to negotiate business and start cooperation. We hope to join hands with friends in different industries to create a brilliant future.
Speaking of this cooperation with the Chinese manufacturer, I just want to say"well dodne", we are very satisfied.
5 Stars By Ellen from Cannes - 2017.04.08 14:55
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
5 Stars By Katherine from Iran - 2018.11.06 10:04
Write your message here and send it to us

Related products

  • Ordinary Discount Industrial Electric Boiler - Double Drum Hot Water Boiler – Double Rings

    Ordinary Discount Industrial Electric Boiler -...

    Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

  • Top Quality Oil Central Heating - Vertical Gas Oil Boiler – Double Rings

    Top Quality Oil Central Heating - Vertical Gas...

    Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

  • Hot Sale for Biomass Steam Boiler - Boiler Valve and Meter – Double Rings

    Hot Sale for Biomass Steam Boiler - Boiler Val...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

  • Outdoor Coal Boiler Factories - Single Drum Steam Boiler – Double Rings

    Outdoor Coal Boiler Factories - Single Drum St...

    Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

  • Hot Sale for Biomass Steam Boiler - DHL Corner Tube Bulk Water Pipe Boiler – Double Rings

    Hot Sale for Biomass Steam Boiler - DHL Corner...

    Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

  • China Electric Steam Boilers Suppliers - Boiler Water Tank – Double Rings

    China Electric Steam Boilers Suppliers - Boile...

    Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...