We take pleasure in an extremely fantastic standing among the our prospects for our great product top quality, competitive cost and the finest support for chinese boiler economizer, industrial thermal oil boiler, lpg steam boiler, We also ensure that your selection will be crafted with the highest quality and reliability. Please feel free to contact us for further information.
China Lpg Hot Water Boiler Supplier - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

China Lpg Hot Water Boiler Supplier - Installation & Technology Service – Double Rings detail pictures

China Lpg Hot Water Boiler Supplier - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

owing to excellent assistance, a variety of high quality products and solutions, aggressive costs and efficient delivery, we take pleasure in an excellent popularity amongst our customers. We are an energetic business with wide market for China Lpg Hot Water Boiler Supplier - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Thailand, Montreal, moldova, The president and all the company members would like to provide professional products and services for customers and sincerely welcome and cooperate with all native and foreign customers for a bright future.
  • We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Elaine from Canada - 2017.02.18 15:54
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Jean from Victoria - 2017.08.21 14:13
    Write your message here and send it to us

    Related products

    • Big discounting Boiler For Hot Water Heating System - Boiler Valve and Meter – Double Rings

      Big discounting Boiler For Hot Water Heating Sy...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Online Exporter Electric Steam Boilers - Coal Boiler Economizer – Double Rings

      Online Exporter Electric Steam Boilers - Coal ...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • One of Hottest for Wood Pellet Boiler - heat recovery boiler – Double Rings

      One of Hottest for Wood Pellet Boiler - heat r...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • Cheapest Price Biomass Boiler Cost - Biomass Steam Boiler – Double Rings

      Cheapest Price Biomass Boiler Cost - Biomass S...

      Biomass Boiler-Hot Sale- Easy Installation Low Heating Value Fuel Wood Rice Husk Pellets etc. Introduction : Biomass Steam Boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to ...

    • Chinese wholesale Industrial Steam Boilers - SHL Bulk Industrial Boiler – Double Rings

      Chinese wholesale Industrial Steam Boilers - S...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • Hot Sale for Biomass Boiler - AAC Autoclave and Boiler – Double Rings

      Hot Sale for Biomass Boiler - AAC Autoclave an...

      Autoclave Characteristics 1 The autoclave is steel horizontal tube-type device, the autoclave lid is pressed by the whole block 16MnR steel, the flange of autoclave body and autoclave lid is used the 16Mn steel in the whole forging processing. The weld parts have been heat treatment and strict nondestructive testing in accordance with relevant standards. 2. Autoclave door is activity Open structure by hand-reducer. The clients can also choice the electric, pneumatic, hydraulic style to ...