It adheres for the tenet "Honest, industrious, enterprising, innovative" to develop new products and solutions continuously. It regards shoppers, success as its individual success. Let us produce prosperous future hand in hand for Chinese water tank, Chinese vertical thermal oil boiler, Boiler Work, Special emphasis around the packaging of merchandise to avoid any damage during transportation,Detailed interest into the useful feedback and strategies of our esteemed shoppers.
China New Boiler Deals - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

China New Boiler Deals - Installation & Technology Service – Double Rings detail pictures

China New Boiler Deals - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our items are commonly identified and trusted by customers and may fulfill continuously switching economic and social wants of China New Boiler Deals - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Poland, Luxemburg, Philippines, We offer OEM services and replacement parts to meet the varying needs of our customers. We offer competitive price for quality products and we will make certain your shipment is handled quickly by our logistics department. We sincerely hope to have the opportunity to meet with you and see how we can help you further your own business.
  • With a positive attitude of "regard the market, regard the custom, regard the science", the company works actively to do research and development. Hope we have a future business relationships and achieving mutual success.
    5 Stars By Amber from Luxemburg - 2017.02.18 15:54
    Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Irma from Hungary - 2018.06.05 13:10
    Write your message here and send it to us

    Related products

    • China Gas Boiler Hot Water Factories - SHX Circulating Fluidized Bed Boiler – Double Rings

      China Gas Boiler Hot Water Factories - SHX Cir...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • OEM Factory for Lpg Steam Boiler - SHX Circulating Fluidized Bed Boiler – Double Rings

      OEM Factory for Lpg Steam Boiler - SHX Circula...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • OEM/ODM Supplier Water Gas Boiler - Autoclave and Boiler – Double Rings

      OEM/ODM Supplier Water Gas Boiler - Autoclave ...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...

    • High Performance Package Boiler - Autoclave and Boiler – Double Rings

      High Performance Package Boiler - Autoclave an...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...

    • factory Outlets for Steam Boiler Electric - Boiler Steam Distribution Cylinder – Double Rings

      factory Outlets for Steam Boiler Electric - Bo...

      Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin...

    • Factory Price For Biomass Fired Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      Factory Price For Biomass Fired Boiler - Gas O...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...