China Steam Tube Manufacturers - Pellets Shells Husk Biomass Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We've got a really efficient group to deal with inquiries from prospects. Our purpose is "100% customer fulfillment by our product excellent, price & our group service" and enjoy a superb track record amid clientele. With many factories, we can easily deliver a wide selection of husk biomass boiler, china plg tank, oil fired combi boiler, We sincerely welcome friends from all over the world to cooperate with us on the basis of long-term mutual benefits.
China Steam Tube Manufacturers - Pellets Shells Husk Biomass Boiler – Double Rings Detail:

Parameter :

DZG(L)Horizontal Type Biomass-Burning Steam Boiler

Main Technology Parameter List

Model DZG2-1.0-S
DZL2-1.25-S
DZL2-1.57-S
DZL2-2.45-S  
DZG4-1.25-S
DZL4-1.25-S
DZL4-1.57-S
DZL4-2.45-S
DZL6-1.25-S
DZL6-1.57-S
DZL6-2.45-S 
DZL8-1.25-S
DZL8-1.57-S
DZL8-2.45-S
DZL10-1.25-S
DZL10-1.57-S
DZL10-2.45-S
Rated Capacity T/h 2 4 6 8 10
Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45
Rated Steam Temp. 183/194/204/226 194/204/226 194/204/226 203.04 194/204/226
Feed Water Temp. 20 20 20/60 20 20/60
Fuel Consumption  Kg/H ~310 ~590 ~900 ~1200 ~1440
Thermal Efficiency  % 78 80 77.44 78 80.6
Heating Surface m² Boiler Body 33.85 75.75 142 205 347
Economizer 24.64 38.5 87.2 139.52
Grate area   m² 3.5 4.66 7.4 8.4 10.98
Designed Fuel Type Biomass Biomass Biomass Biomass Biomass
Max.Transport Weight  Ton 21 26.5 38 33 28/29
Max. Transport Dimension  m 5.9×2.2×3.3 6.5×2.6×3.524 7.4×3.2×4.2 8.1×3.2×4.2 7.6×3.2×3.5
Boiler Auxiliary Equipment Model and Specification
Air Blower Model T4-72-11;3.2A;Right315° T4-72-11;4A;Righ 315° T4-72-11;5A; Right 225° GG8-Na;7.1A; Right 225° 10TG811DRight 225°
Motor Power N=3 Kw N=5.5 Kw N=11 Kw N=11 Kw N=15 Kw
Draft Fan Model Y9-26;6.3C; Right 0° Y-9-26;9D; Right 0° Y-8-39;9D;Right 0° GY8-1;Na9.5D;Right 0° 10JY;9.5D; Right 0°
Motor Power N=11 Kw N=22 Kw N=30Kw N=37Kw N=45 Kw
Gear Box Model GL-5P GL-5P GL-10P GL-16P
Motor Power N=0.55 Kw N=0.55 Kw N=1.1 Kw N=1.1 Kw
Feed Water Pump Model 1½ GC 5×7 1½ GC 5×7 DG 6-25×7 2GC-5xT 1½ GC 6×6
Motor Power N=7.5 Kw N=7.5 Kw N=7.5 Kw N=22 Kw N=2.2 Kw
Dust Remover Model XD-2 XD-4 XD-6 XD-8 XD-10

Fuel: Wood,Rice Husk,shells,Pellets,bagasse,waste etc..

xiangqingpic

Display

Boiler Flow Chat

 

Flow Chat

Boiler Flow Chat

 


Product detail pictures:

China Steam Tube Manufacturers - Pellets Shells Husk Biomass Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our group through specialist training. Skilled expert knowledge, sturdy sense of assistance, to fulfill the provider needs of shoppers for China Steam Tube Manufacturers - Pellets Shells Husk Biomass Boiler – Double Rings , The product will supply to all over the world, such as: French, Sweden, Manila, We only supply quality products and we believe this is the only way to keep business continue. We can supply custom service too such as Logo, custom size, or custom products etc that can according to customer's requirement.
  • This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Rose from Georgia - 2018.09.29 13:24
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Josephine from Egypt - 2018.06.19 10:42
    Write your message here and send it to us

    Related products

    • OEM Supply Electric Steam Boilers - Installation & Technology Service – Double Rings

      OEM Supply Electric Steam Boilers - Installati...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Cheapest Price Biomass Boiler Cost - Gas Steam Boiler – Double Rings

      Cheapest Price Biomass Boiler Cost - Gas Steam...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • Chain Grate Thermal Oil Boiler - Oil Steam Boiler – Double Rings

      Chain Grate Thermal Oil Boiler - Oil Steam Boi...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • China Biomass Boiler Turkey - Gas oil Boiler Burner – Double Rings

      China Biomass Boiler Turkey - Gas oil Boiler B...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • Bottom price Industrial Hot Water Boiler - Boiler Steam Distribution Cylinder – Double Rings

      Bottom price Industrial Hot Water Boiler - Boi...

      Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin...

    • Discount Price Commercial Boiler - SZS Gas Oil PLG Boiler – Double Rings

      Discount Price Commercial Boiler - SZS Gas Oil...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...