We pursue the administration tenet of "Quality is exceptional, Provider is supreme, Name is first", and will sincerely create and share success with all clientele for Electric Heating Boilers, Fire Tube Boilers, Steam Pipe, At our firm with quality first as our motto, we manufacture products that are entirely made in Japan, from materials procurement to processing. This enables them to be used with confident peace of mind.
China Thermal Oil Boiler Factories - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

China Thermal Oil Boiler Factories - Installation & Technology Service – Double Rings detail pictures

China Thermal Oil Boiler Factories - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our corporation has been specializing in brand strategy. Customers' gratification is our greatest advertising. We also source OEM company for China Thermal Oil Boiler Factories - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Plymouth, Belgium, Cancun, We strongly believe that technology and service is our base today and quality will create our reliable walls of future. Only we have better and better quality , could we achieve our customers and ourselves, too. Welcome customers all over the word to contact us for getting further business and reliable relationships. We are always here working for your demands whenever you need.
  • This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
    5 Stars By Ellen from Grenada - 2018.06.05 13:10
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Grace from Bhutan - 2018.07.12 12:19
    Write your message here and send it to us

    Related products

    • Low price for Industrial Boilers Manufacturers - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      Low price for Industrial Boilers Manufacturers ...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • OEM Manufacturer Lpg Boiler - Vertical Wood /Coal Boiler – Double Rings

      OEM Manufacturer Lpg Boiler - Vertical Wood /C...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

    • OEM/ODM China New Boiler - Boiler Valve and Meter – Double Rings

      OEM/ODM China New Boiler - Boiler Valve and Me...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • OEM Customized China Gas Boiler - Boiler Water Tank – Double Rings

      OEM Customized China Gas Boiler - Boiler Water...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...

    • OEM Supply Electric Steam Boilers - SHF Coal Water Slury Steam Boiler – Double Rings

      OEM Supply Electric Steam Boilers - SHF Coal W...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • China wholesale Coal Fired Steam Boiler - Boiler Installation Material – Double Rings

      China wholesale Coal Fired Steam Boiler - Boil...

      Used in Boiler DZL 6-1.25-AII STEAM BOILER Installation Material List   Flange Stop Valve   Item  Description   Quantity 1 DN 150    1.6 MPA 1 PC 2 DN 100    1.6 MPA 1 PC 3 DN 80     1.6 MPA 1 PC 4 DN 65     1.6 MPA 2 PCS 5 DN 50     1.6 MPA 3 PCS 6 DN 40     1.6 MPA 1 PC 7 DN 15     1.6 MPA 1 PC   Flange Check Valve   Item  Description   Quantity 1 DN 50     1.6 MPA 1 PC   Flange   Item  Description   Quantity 1 DN 150      2 PCS 2 DN 100       3...