China Wood Chip Biomass Boiler Factory - Single Drum Hot Water Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization for that long-term to establish jointly with customers for mutual reciprocity and mutual gain for chinese water pump, Outdoor Coal Boiler, New Boiler, We warmly welcome domestic and abroad buyers deliver inquiry to us ,we now have 24hours doing work team! Anytime anywhere we are still here to be your partner.
China Wood Chip Biomass Boiler Factory - Single Drum Hot Water Boiler – Double Rings Detail:

Parameter :

DZG(L)Bearing Pressure Hot water boiler

Main Technology Parameter List

Model DZG0.7-0.7/95/70
DZL0.7-0.7/95/70 
DZG1.4-0.7/95/70
DZL1.4-0.7/95/70
DZL1.4-1.0/115/70
DZL28-1.0/115/70
DZL2.8-1.25/130/70
DZL4.2-1.0/115/70
DZL4.2-1.25/130/70
Rated Capacity T/h 0.7 1.4 2.8 4.2
Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25
Rated Steam Temp. 95 95/115 115/130 115/130
Feed Water Temp. 70 70 70 70
Fuel Consumption  Kg/H ~150 ~310 ~590 ~900
Thermal Efficiency  % 75 78 79 77.44
Heating Surface Boiler Body  32.4 33.85 75.75 142
Economizer  24.64 38.5 87.2
Grate area   m² 1.4/2.05 2.3/3.5 4.66 7.4
Designed Fuel  Type Bituminous Coal Bituminous Coal Bituminous Coal Bituminous Coal
Max. Transport Weight  T ~16 ~21 ~26.5 ~30
Max. Transport Dimension  m 4.3×2.25×2.955.26×2.25×2.95 5.1×2.2×3.35.9×2.2×3.3 6.5×2.6×3.5 6.01×3.4×3.57.29×2.9×1.7
Boiler Auxiliary Equipment Model and Specification
Air Blower Model T4-72-11;3.2A Right T4-72-11;3.5A Right T4-72-11;4A Right T4-72-11;5A  Right
Motor Power N=1.5 Kw N=3 Kw N=5.5 Kw N=11 Kw
Draft Fan Model YX9-355C ; Right 0° Y-9-26;6.3C ; Right 0° Y-9-26;9D;Right 0° Y8-399D;Ring 0°
Motor Power N=5.5 Kw N=11 Kw N=22 Kw N=30 Kw
Gear Box Model GL-5P GL-5P GL-5P GL-10P
Motor Power N=0.55 Kw N=0.55 Kw N=0.55 Kw N=1.1Kw
Feed Water Pump Model 1.5WCT-120 1.5WCT-120 1½ GC5x5 2GC5x4
Motor Power N=2.2 Kw N=2.2Kw N=5.5 Kw N=11 Kw
Dust Remover Model XD-1 XD-2 XD-4 XD-6

 

ModelItem DZL7-1.0/115/70 DZL14-1.0/115/70 DZL29-1.25/130/70 DZL46-1.25/130/70 DZL58-1.25/130/70 DZL70-1.25/130/70
Rated Capacity T/h 7 14 29 46 58 70
Rated Working Pressure Mpa 1.0 1.0 1.25 1.25 1.25 1.25
Rated Steam Temp. 115 115 130 130 130 130
Feed Water Temp. 70 70 70 70 70 70
Heating AreaBoiler Body 228.6 434.7 Radiation:73.07Convection:903.01 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5
Grate area   m² 11.5 22.5 34.5 57.8 77 91
FuelKj/Kg Coal  Class II Bituminous Coal
Low heat 18757 17693
Fuel Consumption Kg/h ~1440 ~2700 ~6610 ~10500 ~12800 ~15300
Thermal Efficiency  % 80 80 82.5 82.05 83.03 83.28
Max. Transport Weight  Ton 35 28 19.68 28.796 31 31

Product detail pictures:


Related Product Guide:
Boiler Structure

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" and the theory of "quality the basic, trust the first and management the advanced" for China Wood Chip Biomass Boiler Factory - Single Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Maldives, luzern, Malaysia, To meet the requirements of specific customers for each bit more perfect service and stable quality merchandise. We warmly welcome customers around the world to visit us, with our multi-faceted cooperation, and jointly develop new markets, create a brilliant future!
The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
5 Stars By Elma from Ireland - 2018.12.05 13:53
Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
5 Stars By Catherine from Algeria - 2017.05.21 12:31
Write your message here and send it to us

Related products

  • Induced Draft Fan - Boiler Electric Control – Double Rings

    Induced Draft Fan - Boiler Electric Control &#...

    More Photos Electric Control Container Overview 2-4T 6T 10T 15T 20T 25T Sheet 1: 2t steam boiler electrical instrument control system configuration (common configuration 1.25Mpa) Features name Specification unit Qty Brand Electrical control           Induced draft fan control 11KW  Star Delta Start  set  1  Zhengtai Blower control  3KW  Direct start  set  1  Grate control  0.55KW  Direct start  set  1  Coal machine control 1.1KW  Direct start  set  1  Slag machine control ...

  • Factory wholesale Electricity Boiler - Gas Steam Boiler – Double Rings

    Factory wholesale Electricity Boiler - Gas Ste...

    Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

  • China Fire Tube Boilers - AAC Autoclave and Boiler – Double Rings

    China Fire Tube Boilers - AAC Autoclave and Bo...

    Autoclave Characteristics 1 The autoclave is steel horizontal tube-type device, the autoclave lid is pressed by the whole block 16MnR steel, the flange of autoclave body and autoclave lid is used the 16Mn steel in the whole forging processing. The weld parts have been heat treatment and strict nondestructive testing in accordance with relevant standards. 2. Autoclave door is activity Open structure by hand-reducer. The clients can also choice the electric, pneumatic, hydraulic style to ...

  • 2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings

    2019 China New Design Steam Boiler Price - Ins...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

  • China New Product Electric Heating Boilers - SZS Gas Oil PLG Boiler – Double Rings

    China New Product Electric Heating Boilers - S...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

  • OEM Supply Water Tube Boilers - Single Drum Steam Boiler – Double Rings

    OEM Supply Water Tube Boilers - Single Drum St...

    Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...