Chinese Professional Gas Steam Boiler - Double Drum Hot Water Boiler – Double Rings
Chinese Professional Gas Steam Boiler - Double Drum Hot Water Boiler – Double Rings Detail:
Parameter :
SZL Bearing Pressure Hot water Boiler
Main Technology Parameter List
ModelItem | SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII | SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII | SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII | |||
Rated Capacity | 2.8T/h | 4.2 T/h | 5.6 T/h | |||
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |||
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | |||
Feed Water Temp. ℃ | 70 | 70 | 70 | |||
Fuel Consumption Kg/H | ~580 | ~900 | ~1130 | |||
Thermal Efficiency % | 78 | 80 | 80 | |||
Heating Surface | Boiler Body m² | 80.5 | 142 | 178 | ||
Economizer m² | 38.5 | 87.2 | 122.08 | |||
Grate area m² | 4.84 | 7.78 | 10.42 | |||
Design Fule | Bituminous Coal | |||||
Max. Transport Weight | 30 T | ~25T | ~26T | |||
Max. Transport Dimension m | 6.9×2.5×3.5 | Up6.09×3.04×3.6D:7.3×2.86×1.72 | 6.9×3.33×3.55 | |||
Boiler Auxiliary Equipment Model and Specification | ||||||
Air Blower | Model | T4-72-11 4ARight 315° | T4-72-11 5ARight 225° | GC8-1Right 225° | ||
Motor Power | N=5.5 Kw | N=11 Kw | N=11 Kw | |||
Draft Fan | Model | Y9-26 9DRight 0° | Y8-39 9DRight 0° | GY8-1Right 0° | ||
Motor Power | N=22 Kw | N=30 Kw | N=37 Kw | |||
Gear Box | Model | GL-5P | GL-10P | GL-10P | ||
Motor Power | N=0.55 Kw | N=1.1Kw | N=1.1 Kw | |||
Feed Water Pump | Model | 1½ GC5x7 | 2GC-5×5 | 2GC-5×4 | ||
Motor Power | N=7.5 Kw | N=11 Kw | N=11 Kw | |||
Dust Remover | XD-4 | XD-6 | XD-8 |
ModelItem | SZL7-1.0/115/70-AIISZL7-1.25/130/70-AII | SZL10.5-1.0/115/70-AIISZL10.5-1.25/130/70-AII | SZL14-1.0/115/70-AIISZL14-1.25/130/70-AII | SZL17.5-1.0/115/70-AIISZL17.5-1.25/130/70-AII | |
Rated Capacity | 7T/h | 10.5 T/h | 14 T/h | 17.5T/h | |
Rated Working Pressure Mpa | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | 1.0/1.25 | |
Rated Steam Temp. ℃ | 115/130 | 115/130 | 115/130 | 115/130 | |
Feed Water Temp. ℃ | 70 | 70 | 70 | 70 | |
Fuel Consumption Kg/H | ~1400 | ~1900 | ~2700 | ~3650 | |
Thermal Efficiency % | 82 | 82 | 82 | 82 | |
Heating Surface m² | Radiation Tube | 39.43 | 37.21 | 58.4 | 58.4/68.4 |
convection bank | 213.4 | 284.68 | 307.4 | 307.4/384.8 | |
Economizer m² | 122.08 | 130.8 | 413 | 413/521 | |
Grate area m² | 11.99 | 17.81 | 22.56 | 24.52 | |
Design Fule | Bituminous Coal (Low location of heat value:19228Ki/kg) | ||||
Max. Transport Weight | ~40 T | ~43T | ~30T | ~30T | |
Max. Transport Dimension | 7.9×3.2×3.5 | 10×3.2×3.5 | 11×3.2×3.5 | 12×3.2×3.54 |
Product detail pictures:

Related Product Guide:
Boiler Structure
In the past few years, our company absorbed and digested advanced technologies both at home and abroad. Meanwhile, our company staffs a team of experts devoted to the development of Chinese Professional Gas Steam Boiler - Double Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Latvia, New Orleans, Malaysia, With many years good service and development, we've a professional international trade sales team. Our products have exported to North America, Europe, Japan, Korea, Australia, New Zealand, Russia and other countries. Looking forward to build up a good and long term cooperation with you in coming future!

This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.

Write your message here and send it to us