Sticking for the principle of "Super Quality, Satisfactory service" ,We have been striving for being a superb small business partner of you for heavy oil burner, slag extractor, Chinese slag remover, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Chinese wholesale Natural Gas Steam Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Chinese wholesale Natural Gas Steam Boiler - Installation & Technology Service – Double Rings detail pictures

Chinese wholesale Natural Gas Steam Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We are proud of the superior customer gratification and wide acceptance due to our persistent pursuit of top of the range both of those on merchandise and service for Chinese wholesale Natural Gas Steam Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Luxemburg, Turkmenistan, Pakistan, Till now, the items list has been updated regularly and attracted clients from around the globe. Comprehensive facts is often obtained in our web-site and you'll be served with premium quality consultant service by our after-sale group. They are likely to help you get thorough acknowledge about our goods and make a satisfied negotiation. Company go to to our factory in Brazil is also welcome at any time. Hope to obtain your inquiries for any pleased co-operation.
  • The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
    5 Stars By EliecerJimenez from Benin - 2018.02.12 14:52
    Goods just received, we are very satisfied, a very good supplier, hope to make persistent efforts to do better.
    5 Stars By Naomi from Ukraine - 2018.06.28 19:27
    Write your message here and send it to us

    Related products

    • China Water Tube Boiler Factory - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      China Water Tube Boiler Factory - Coal Boiler ...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • Low MOQ for Hot Water Heating Boilers - Biomass Wood Thermal Oil Boiler – Double Rings

      Low MOQ for Hot Water Heating Boilers - Biomas...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • Hot-selling Industrial Electric Boiler - Gas oil Boiler Burner – Double Rings

      Hot-selling Industrial Electric Boiler - Gas o...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • Factory Supply High Pressure Steam Boiler - SZS Gas Oil PLG Boiler – Double Rings

      Factory Supply High Pressure Steam Boiler - SZ...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Biomass Boiler Price List - Coal Boiler Chain Grate – Double Rings

      Biomass Boiler Price List - Coal Boiler Chain ...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • Cheap PriceList for Best Oil Fired Boilers - Biomass Steam Boiler – Double Rings

      Cheap PriceList for Best Oil Fired Boilers - B...

      Biomass Boiler-Hot Sale- Easy Installation Low Heating Value Fuel Wood Rice Husk Pellets etc. Introduction : Biomass Steam Boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to ...