Electric Steam Boilers China - Pressure Vessel – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We have our own product sales staff, style crew, technical group, QC staff and package staff. We now have strict high quality management procedures for each approach. Also, all of our workers are experienced in printing subject for Thermal Oil Boiler, good thermal oil boiler, Chinese boiler flue, We are highly aware of quality, and have the certification ISO/TS16949:2009. We are dedicated to supply you high quality products with reasonable price.
Electric Steam Boilers China - Pressure Vessel – Double Rings Detail:

Introduction:

Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc.
Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing.
In addition, also equipped with safety devices, meter and safety internals for protection purpose .
Pressure Vessel Main Performance Parameter List
Steam Pressure1.0Mpa
Inlet Temperature 250℃
Saturation Temperature 179℃
Heating Water:Inlet Temperature 90℃;
Outlet Temperature 140℃

Parameter

PW=1.6Mpa Liquified Petroleum Gas Horizontal Tank

Rated Capacity m3

5

10

20

24

30

50

100

Geometric Volume m3

5.03

10.02

21.20

24.31

30.08 50.04 100.23
Max.Filling Capacity  T

2.19

4.37

9.26

10.64

13.12

21.39

43.70

Diameter mm

1200

1600

2000

2000

2200

2600

3000

Length  mm

4670

5270

7100

8270

8310

9820

14720

Equipment Weight  Kg

1890

3410

6100

6800

8700

12300

25100

Pressure Vessel Main Performance Parameter List

Steam Pressure1.0Mpa

Inlet Temperature 250℃

Saturation Temperature 179℃

Heating Water:Inlet Temperature 90℃;

Outlet Temperature 140℃

ModelItem BH400-6-QS BH500-13-QS BH600-20-QS BH800-36-QS BH1000-83-QS
Specification Diameter   mm

400

500

600

800

1000

Area    m2

6

13

20

36

83
Length   m

1.5

2.0

2.0

2.0

2.5

Tube

28

48

72

130

240

Tube side Number

2

2

2

2

2

Heating Water Drum Number

6

6

6

6

6

Flow  T/h

19.6

46.4

71.93

129.36

318.45

Flow Rate m/s

0.27

0.37

0.38

0.38

0.51

Force Loss   Mpa

0.21×10-3

0.44×10-3

0.47×10-3

0.46×10-3

0.91×10-3

Drum(Steam) Flow T/h

2.05

4.86

7.54

13.56

33.38

Heat Transfer performance  Heat transfer m2/

3120

3410

3437

3434

3667

Capacity  MW

1.15

2.72

4.22

7.58

18.63

  Equipment Weight Kg

450

800

1000

2100

3000


Product detail pictures:

Electric Steam Boilers China - Pressure Vessel – Double Rings detail pictures

Electric Steam Boilers China - Pressure Vessel – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We are proud of the superior customer gratification and wide acceptance due to our persistent pursuit of top of the range both of those on merchandise and service for Electric Steam Boilers China - Pressure Vessel – Double Rings , The product will supply to all over the world, such as: Ghana, Botswana, Madagascar, High output volume, top quality, timely delivery and your satisfaction are guaranteed. We welcome all inquiries and comments. We also offer agency service---that act as the agent in china for our customers. If you are interested in any of our products or have an OEM order to fulfill, please feel free to contact us now. Working with us will save you money and time.
  • This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Amelia from Madagascar - 2017.09.30 16:36
    It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Sally from Philippines - 2018.09.23 18:44
    Write your message here and send it to us

    Related products

    • 18 Years Factory Industrial Electric Boiler - Installation & Technology Service – Double Rings

      18 Years Factory Industrial Electric Boiler - ...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Manufacturer for Waste Heat Boiler - heat recovery boiler – Double Rings

      Manufacturer for Waste Heat Boiler - heat reco...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • Factory Price For Thermal Oil Boiler - Steam&Hot Water Pipe – Double Rings

      Factory Price For Thermal Oil Boiler - Steam&a...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • Big discounting Boiler For Hot Water Heating System - SZS Gas Oil PLG Boiler – Double Rings

      Big discounting Boiler For Hot Water Heating Sy...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Factory For Heat Boilers - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      Factory For Heat Boilers - Coal Boiler Biomass...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • Competitive Price for Wood Chip Biomass Boiler - Coal Boiler Biomass Boiler F.D.Fan – Double Rings

      Competitive Price for Wood Chip Biomass Boiler ...

      FD Fan used in Coal Boiler Industrial centrifugal blower fan is used for steam boilers, which has good quality and high efficiency. According to your requirements, we can provide technical solution and technical solution. Below industrial blower fan picture for your reference.