Factory Free sample Outdoor Coal Boiler - Gas/Oil Fired Hot Water Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

With responsible good quality method, good status and excellent client services, the series of solutions produced by our company are exported to lots of countries and regions for heavy oil burner, Electric Water Boilers, pellet thermal oil boiler, We are seeking for extensive cooperation with honest customers, achieving a new cause of glory with customers and strategic partners.
Factory Free sample Outdoor Coal Boiler - Gas/Oil Fired Hot Water Boiler – Double Rings Detail:

Introduction :

WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney.
There are the front and back Smokebox Cap in the boiler, easy to maintenance.
Excellent burner adopts combustion automatic ratio adjustment , feedwater automatic control, start and stop program , automatic operation and other advanced technology, also has the High&Low water level alarm and protection function of Extreme low water levels, ultra-high pressure, turn off etc..
The boiler has the features of compact structure, safe and reliable, simple operation, quick installation, less pollution, low noise, and high efficiency.

WNS-Steam-Boiler-Layout

Feature:

1.Overall structure is reasonable and compact, easy to install.
The boiler is composed of Boiler body, chimney and piping system. The boiler body and chimney have been finished in the factory, the pipe, valve and gauge in the boiler have also been completed in the factory. The clients only need to assemble the boiler and chimney together , connect the gas ,power, water and then
to test run , greatly shorten the installation time, and ensure the quality of the boiler.
2. Advanced design, the whole structure, combustion chamber assemble in Front smokebox cover, the body has the heating surface and combustion chamber. It is the reasonable structure, compact, low consumption of steel , the furnace gall is bias wave form furnace, the insulation layer is new thermal insulation materials, color sheet packaging, packaging shape is rectangular, the boiler performance, weight, structure, size, shape modeling is more advanced and perception .
The feed water device equip on the right side of the boiler base , the whole structure, do not need another foundation.
3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run
4. Complete Ancillary equipment, advanced comprehensive technology

advantage2

Parameter

WNS Hot Water Boiler burning oil or gas

Main Technology Parameter List

ModelItem WNS0.35-0.7/95/70-YQ WNS0.7-0.7/90/70-YQ WNS1.05-0.7/95/70-YQ WNS1.4-0.7/95/70-YQ WNS2.1-0.7/95/70-YQ
Rated Capacity         Mw

0.35

0.7

1.05

1.4

2.1

Rated Working Pressure

0.7 Mpa

0.7 Mpa

0.7 Mpa

0.7 Mpa

0.7 Mpa
Output Water Temp.    

95

95

95

95

95

Return Water Temp.    

70

Heating Surface

12.05

30.7

45.5

60.9

90.5

Exhaust gas Temp.      

180

180

178

181

179

Thermal Efficiency      %

84

85

86

88

88

Design Fuel

Diesel Oil/Heavy Oil/Natural Gas/Liquid Gas/Town Gas

Ringelmann shade 

< Grade 1

FuelConsumption

Kg/h

(Nm3/h)

Diesel Oil

31

62.5

93.66

124.75

187.11

Heavy oil

33.5

66.99

98.89

131.72

197.55

Liquid gas

36

72.2

108.23

144.16

216.21

Town gas

74

144

216.5

288.3

432.4

Boiler Weight  Ton Empty

2.562

4.95

5.5

7.34

10.1

Full Water

3.162

6.5

7.6

12.8

16

Power Source   V 380V/50Hz

 

ModelItem WNS2.8-1.0/115/70WNS2.8-1.25/130/70   WNS3.5-1.0/115/70WNS3.5-1.25/130/70 WNS4.2-1/115/70 WNS4.2-1.25/130/70 WNS5.6-1/115/70WNS5.6-1.25/130/70 WNS7-1/115/70WNS7-1.25/130/70
Rated Capacity Mw

2.8

3.5

4.2

5.6

7

Rated Working Pressure 1.0/1.25 Mpa

1.0/1.25 Mpa

1.0/1.25 Mpa

1.0/1.25 Mpa

1.0/1.25 Mpa
Output Water Temp.

115/130

115/130

115/130

115/130

115/130

Return Water Temp.

70

Heating Surface

124.7

137

145

165

210

Exhaust gas Temp.

180.5

180

179

178.5

182

Thermal Efficiency %

88

89

89

90

90

Design Fuel

Diesel Oil/Heavy Oil/Natural Gas/Liquid Gas/Town Gas

Ringelmann shade 

< Grade 1

FuelConsumption

Kg/h

(Nm3/h)

Diesel Oil

249.21

311.17

373.41

497.78

621

Heavy oil

263.12

328.55

394.26

525.57

680

Liquid gas

287.98

359.58

431.5

575.2

719.17

Town gas

575.96

719.16

863

1151

1438

Boiler Weight  Ton Empty

13.9

14.5

15.1

19.1

19.7

Full Water

22.5

24.9

25.5

31.8

37

Power Source   V 380V/50Hz

Product detail pictures:


Related Product Guide:
Boiler Structure

It is our responsibility to meet your needs and efficiently serve you. Your satisfaction is our best reward. We are looking forward to your visit for joint growth for Factory Free sample Outdoor Coal Boiler - Gas/Oil Fired Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Germany, Namibia, France, Our factory covers an area of 12,000 square meters, and has a staff of 200 people, among which there are 5 technical executives. We are specialized in producing.We have rich experience in export. Welcome to contact us and your enquiry will be replied as soon as possible.
Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
5 Stars By Anne from Jordan - 2018.08.12 12:27
The enterprise has a strong capital and competitive power, product is sufficient, reliable, so we have no worries on cooperating with them.
5 Stars By Poppy from UK - 2018.04.25 16:46
Write your message here and send it to us

Related products

  • Chain Grate Boiler - Installation & Technology Service – Double Rings

    Chain Grate Boiler - Installation & Techno...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

  • China Oil Fired Steam Boiler - AAC Autoclave and Boiler – Double Rings

    China Oil Fired Steam Boiler - AAC Autoclave a...

    Autoclave Characteristics 1 The autoclave is steel horizontal tube-type device, the autoclave lid is pressed by the whole block 16MnR steel, the flange of autoclave body and autoclave lid is used the 16Mn steel in the whole forging processing. The weld parts have been heat treatment and strict nondestructive testing in accordance with relevant standards. 2. Autoclave door is activity Open structure by hand-reducer. The clients can also choice the electric, pneumatic, hydraulic style to ...

  • Manufacturer for Waste Heat Boiler - Wood Biomass Boiler – Double Rings

    Manufacturer for Waste Heat Boiler - Wood Biom...

    Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory

  • Fast delivery Industrial Biomass Boilers - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

    Fast delivery Industrial Biomass Boilers - Coa...

    I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3

  • Renewable Design for Industrial Electric Boiler - Gas oil Boiler Burner – Double Rings

    Renewable Design for Industrial Electric Boiler...

    More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

  • China Steam Pipe - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

    China Steam Pipe - Coal Boiler Biomass Boiler ...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...