Our products are broadly regarded and reliable by end users and can meet up with constantly transforming financial and social requires of Electric Water Boilers, power plant heat recovery boiler, china oil boiler, Our ultimate target is usually to rank as a top brand also to lead as a pioneer in our field. We are sure our profitable experience in tool generation will gain customer's trust, Wish to co-operate and co-create a far better foreseeable future with you!
Factory made hot-sale Cfb Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Factory made hot-sale Cfb Boiler - Installation & Technology Service – Double Rings detail pictures

Factory made hot-sale Cfb Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With dependable high-quality method, fantastic standing and ideal purchaser assistance, the series of products produced by our firm are exported to many countries and regions for Factory made hot-sale Cfb Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Ukraine, Chicago, Argentina, Looking forward, we will keep pace with the times, continuing to create new products. With our strong research team, advanced production facilities, scientific management and top services, we will supply high quality products to our customers worldwide. We sincerely invite you to be our business partners for mutual benefits.
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Mabel from Danish - 2018.10.31 10:02
    It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Christine from Jordan - 2017.01.11 17:15
    Write your message here and send it to us

    Related products

    • Well-designed Biomass Pellet Boiler - Boiler Valve and Meter – Double Rings

      Well-designed Biomass Pellet Boiler - Boiler V...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Trending Products Boiler System - Pressure Vessel – Double Rings

      Trending Products Boiler System - Pressure Ves...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • China Cheap price Biomass Boiler - Boiler Installation Material – Double Rings

      China Cheap price Biomass Boiler - Boiler Inst...

      Used in Boiler DZL 6-1.25-AII STEAM BOILER Installation Material List   Flange Stop Valve   Item  Description   Quantity 1 DN 150    1.6 MPA 1 PC 2 DN 100    1.6 MPA 1 PC 3 DN 80     1.6 MPA 1 PC 4 DN 65     1.6 MPA 2 PCS 5 DN 50     1.6 MPA 3 PCS 6 DN 40     1.6 MPA 1 PC 7 DN 15     1.6 MPA 1 PC   Flange Check Valve   Item  Description   Quantity 1 DN 50     1.6 MPA 1 PC   Flange   Item  Description   Quantity 1 DN 150      2 PCS 2 DN 100       3...

    • Cheap PriceList for Best Oil Fired Boilers - Autoclave and Boiler – Double Rings

      Cheap PriceList for Best Oil Fired Boilers - A...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...

    • China OEM Natural Gas Hot Water Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      China OEM Natural Gas Hot Water Boiler - Gas O...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • Big Discount Electric Hot Water Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Big Discount Electric Hot Water Boilers - Coal...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...