We take pleasure in an extremely fantastic standing among the our prospects for our great product top quality, competitive cost and the finest support for Pressure Vessel, Pressure For Boiler, oil boiler installation material, At present, company name has more than 4000 kinds of products and gained good reputation and big shares on market domestic and overseas.
Factory selling Hot Water Tube - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Factory selling Hot Water Tube - Installation & Technology Service – Double Rings detail pictures

Factory selling Hot Water Tube - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our development depends on the advanced equipment, excellent talents and continuously strengthened technology forces for Factory selling Hot Water Tube - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Hongkong, Mecca, Hamburg, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Margaret from Muscat - 2017.08.18 11:04
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Sabina from Bangladesh - 2018.02.08 16:45
    Write your message here and send it to us

    Related products

    • OEM/ODM Supplier Oil Boiler - Boiler Water Tank – Double Rings

      OEM/ODM Supplier Oil Boiler - Boiler Water Tan...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...

    • Cheap price China Industrial Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings

      Cheap price China Industrial Boiler - Coal Boi...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Factory wholesale Oil Condensing Boilers - Vertical Gas Oil Boiler – Double Rings

      Factory wholesale Oil Condensing Boilers - Ver...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

    • 8 Year Exporter Stoker Fired Boiler - Vertical Wood /Coal Boiler – Double Rings

      8 Year Exporter Stoker Fired Boiler - Vertical...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

    • High reputation Industrial Gas Boiler - Pressure Vessel – Double Rings

      High reputation Industrial Gas Boiler - Pressu...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • China Wood Pellet Boiler Factory - SHL Bulk Industrial Boiler – Double Rings

      China Wood Pellet Boiler Factory - SHL Bulk In...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...