Factory Supply Wood Pellet Boiler - Coke Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

The organization keeps on the procedure concept "scientific management, high quality and efficiency primacy, purchaser supreme for husk biomass boiler, industrial oil boiler, Heating Water Boiler, We warmly welcome you to establish cooperation and create a bright future together with us.
Factory Supply Wood Pellet Boiler - Coke Boiler – Double Rings Detail:

Instruction

DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined with efficient water film dust collector make the ash to meet the requirements of Class A.

The series coking boiler can reach the environmental effects of the gas boiler by burning bituminous coal cost , environmental protection and energy saving.

Parameter :

DZH Coking coil boiler

Main Technology Parameter List

Model DZH1-0.7-T  DZH2-1.25 DZH4-1.25-T DZH6-1.25-T DZH8-1.25-T DZH10-1.25-T
Rated Capacity   1 T/h 2 T/h 4 T/h 6 T/h 8 T/h 10 T/h
Rated Working Pressure 0.7 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa
Rated Steam Temp. 171 194 194 194 194 194
Feed Water Temp. 20
Heating Surface Boiler Body  25.27 33.85 76 142 160 207
Economizer  17.7 35.4 59 87.2 122.08 140
Grate area   m² 1.97 2.68 3.97 6.9 7.4 9.2
Design Fule Metallurgical coke ,foundry coke I II
Fuel Consumption  Kg/H ~120 ~230 ~475 ~665
Thermal Efficiency  % 76 78 78 78 79 80
Max. Transport Weight   ~9 T ~14.5T ~21T ~25T ~30T ~20T
Max. Transport Dimension 3.95×1.9×2.6 4.2×2.7×3.0 5.8×2.8×3.2 6.57×2.75×3.45 7.1×3.2×3.5 7.6×3.2×3.5
Finished boiler size m 3.95×1.9×2.68 4.2×2.9×4.2 5.8×3.5×4.4 6.6x3x3.6 7.2x4x4.2 7.7×4.1×4.5
Boiler Auxiliary Equipment Model and Specification
Air Blower Model Y6-30-12Left 90° YX-9-35Left 90° YX9-35Right 0° GY6-1Right 0° 10TYRight 0° 10TYRight 0°
Motor Power N=4 Kw N=7.5 Kw N=18.5 Kw N=30 Kw N=45 Kw N=45 Kw
Draft Fan Model T4-72   Right 0° T4-72   Right 315° T4-72   Right 315° GG6-1Right 225° 10TGRight 225° 10TGRight 225°
Motor Power N=1.1 Kw N=2.2 Kw N=5.5 Kw N=7.5 Kw N=14 Kw N=15 Kw
Feed Water Pump Model W vortex 1½ GC5x7 1½ GC5x7 DG6-25×6 DG12-25×6 DG12-25×7
Motor Power N=3 Kw N=7.5 Kw N=7.5 Kw N=7.5 Kw N=11 Kw N=15 Kw
Dust Remover Water Film Dust Remover

Product detail pictures:

Factory Supply Wood Pellet Boiler - Coke Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our products are widely recognized and trusted by users and can meet continuously developing economic and social needs for Factory Supply Wood Pellet Boiler - Coke Boiler – Double Rings , The product will supply to all over the world, such as: Argentina, Costa Rica, Dominica, With all these supports, we can serve every customer with quality product and timely shipping with highly responsibility. Being a young growing company, we might not the best, but we are trying our best to be your good partner.
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Elizabeth from Frankfurt - 2017.03.08 14:45
    Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Maggie from Montreal - 2018.06.26 19:27
    Write your message here and send it to us

    Related products

    • China Burner Boiler - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      China Burner Boiler - Coal Boiler Biomass Boil...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • Factory Outlets Thermal Oil Boiler - Boiler Tube – Double Rings

      Factory Outlets Thermal Oil Boiler - Boiler Tu...

      More Photos Boiler Steel Pipe/Tube is a kind of seamless steel pipe. The manufacturing method is the same as seamless steel pipes, but there are strict requirements for the steel grades used to manufacture boiler steel pipes. According to the temperature level, it is divided into two types: low pressure boiler tube and high pressure boiler tube.

    • Hot-selling Industrial Electric Boiler - Vertical Wood /Coal Boiler – Double Rings

      Hot-selling Industrial Electric Boiler - Verti...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

    • Competitive Price for Pressure For Boiler - Gas oil Boiler Burner – Double Rings

      Competitive Price for Pressure For Boiler - Ga...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • China Lpg Hot Water Boiler Supplier - Installation & Technology Service – Double Rings

      China Lpg Hot Water Boiler Supplier - Installa...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Factory wholesale Steam Boiler Manufacturer - Boiler Water Pump – Double Rings

      Factory wholesale Steam Boiler Manufacturer - ...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded