Factory wholesale Biomass Boiler - Boiler Sample Cooling Collection – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

So as to provide you with ease and enlarge our business, we even have inspectors in QC Crew and guarantee you our best company and solution for china pressure vessel, industrial oil boiler, condensate pipingsteam boiler pipingsteam pipe linesteam jacketed pipesteam boiler pipingpipe for steam, We have a big inventory to fulfill our customer's requires and needs.
Factory wholesale Biomass Boiler - Boiler Sample Cooling Collection – Double Rings Detail:

Used in Boiler

Sampling Cooler 
This entry was reviewed by the “Popular Science China” science encyclopedia entry compilation and application project.
An instrument used for sampling and cooling of soda-water samples in a boiler room or power plant.
The sampling cooler comprises a cooling water tank, an inlet pipe, a flange cover, a outlet pipe, a busbar and a plurality of cooling coils;
It can effectively improve the accuracy of water quality analysis, and at the same time the connecting point between the equipment is simple.
 
Structure
Connected with flange cover the top of the cooling water tank is equipped with coil pipe mouth of the flange cover with holes, in the middle of the cooling coil set in cooling water in the box, the outlet and inlet end of the cooling coil respectively through Kong Yanshen to cooling water tank, among them, the entry of the cooling coil and connected to the boiler, the export of cooling coil, directly above the bus slot of the water in the cooling coil by cooling coil exports into confluence worse, bus slot connected at the bottom of the drain;
The bottom of the cooling water tank is provided with a water inlet, the outlet of the water inlet pipe is connected with the water inlet of the cooling water tank;
The top of the cooling water tank is also provided with an outlet, and the inlet of the outlet pipe is connected with the outlet of the cooling water tank .
 
Principle
Sampling cooler used for boiler room or soda assay sample cooling power station, the water in the boiler and heating system mostly higher temperature, and high temperature is not convenient to sampling, also not easy to determine, in the sample should be cool, so let’s introduce the sample of sampling point sampling cooler for cooling, general requirements to ensure traffic in the 500-700 ml/min, the sample can take a 30 to 40 degrees cold, satisfy the People’s Republic of China power industry DL/T 457-91 standard.
 
Characteristics 
The sampling cooler is suitable for sampling medium such as liquid and gas with high temperature. It has the advantages of compact structure, high heat transfer efficiency, convenient cleaning and long service life.
 
Specifications
1: The sampler tube is stainless steel and the housing is carbon steel.
2. Generally, the sampling cooling pipe can be welded and flange with diameter of 10, 12, 14, 16 and 18mm (or optionally specified by the user). The cooling water interface is DN25 with external thread.
3: The general types are qYl-159/0.32, QYl-219/0.40 and QYl-273/0.54.
4: Whether to combine (that is, whether to support, water tank, valve, etc..
 
Sampling procedure
1.Boiler water sampling
The boiler water sample is generally taken out of the continuous drain pipe of the drum and sent to the cooler.
The sampling point should be as close as possible to the outlet of the drain line drain drum and as far as possible before the first drain valve behind the drain drum.2.Sampling of feed water
The sampling point of the water supply is generally set after the feed pump, and a small pipe should be connected to the vertical pipe line of the water supply pipe on the high-pressure feed pipe before the economizer, from which the sample of the water supply is led to the sampling cooler.
The sampling tube of the feed water should be located at a place where the feed water can be mixed after dosing.
3.Sampling of condensed water
The condensate water sampling point is generally located in the condensate water pipe at the outlet of the condensate pump, should not be installed in the condensate pump entrance, because the pressure of the condensate pump entrance is lower than atmospheric pressure.
4.Hydrophobic sampling
The drainage is generally sampled in the drainage tank.
The sampling point is usually located about 300mm away from the bottom of the drain tank.
Steam samples are condensed into water through the sampling cooler.
The steam flow rate in the steam sampler is generally 20-30kg/h.
The requirements for the sample lead – out duct and cooler are the same as for water sampling.by metal corrosion products in the tubes during sampling.
 
Attention
Stainless steel tubes shall be used for sampling. Carbon steel tubes or brass tubes shall not be used to avoid contamination of the samples by metal corrosion products in the tubes during sampling.
sampling


Product detail pictures:

Factory wholesale Biomass Boiler - Boiler Sample Cooling Collection – Double Rings detail pictures

Factory wholesale Biomass Boiler - Boiler Sample Cooling Collection – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Sticking towards the principle of "Super High-quality, Satisfactory service" ,We've been striving to become a superb business partner of you for Factory wholesale Biomass Boiler - Boiler Sample Cooling Collection – Double Rings , The product will supply to all over the world, such as: Paraguay, Belize, Ukraine, Why we can do these? Because: A, We are honest and reliable. Our products have high quality, attractive price, sufficient supply capacity and perfect service. B, Our geographical position has a big advantage . C, Various types: Welcome your inquiry, It will be highly appreciated.
  • The customer service reprersentative explained very detailed, service attitude is very good, reply is very timely and comprehensive, a happy communication! We hope to have a opportunity to cooperate.
    5 Stars By Emma from Mozambique - 2018.05.15 10:52
    Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By olivier musset from Japan - 2017.06.29 18:55
    Write your message here and send it to us

    Related products

    • High Quality for Lpg Boiler - SZS Gas Oil PLG Boiler – Double Rings

      High Quality for Lpg Boiler - SZS Gas Oil PLG ...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Big Discount Electric Hot Water Boilers - SZS Gas Oil PLG Boiler – Double Rings

      Big Discount Electric Hot Water Boilers - SZS ...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Manufacturing Companies for Coal Boiler For Sale - Single Drum Steam Boiler – Double Rings

      Manufacturing Companies for Coal Boiler For Sal...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

    • Leading Manufacturer for Bosch Boiler - LPG Pressure Tank – Double Rings

      Leading Manufacturer for Bosch Boiler - LPG Pr...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Wholesale Price Industrial Boiler - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      Wholesale Price Industrial Boiler - Coal Boile...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • professional factory for Boiler Installation Material – Coal Boiler Economizer – Double Rings

      professional factory for Boiler Installation Ma...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...