Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We always think and practice corresponding to the change of circumstance, and grow up. We purpose at the achievement of a richer mind and body as well as the living for boiler termoelectric, electric hot water boiler, rice husk hot water boiler, Our service concept is honesty, aggressive, realistic and innovation. With your support, we will grow much better.
Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings Detail:

Used in Boiler

DZL 6-1.25-AII STEAM BOILER Installation Material List

  Flange Stop Valve

  Item  Description   Quantity
1 DN 150    1.6 MPA 1 PC
2 DN 100    1.6 MPA 1 PC
3 DN 80     1.6 MPA 1 PC
4 DN 65     1.6 MPA 2 PCS
5 DN 50     1.6 MPA 3 PCS
6 DN 40     1.6 MPA 1 PC
7 DN 15     1.6 MPA 1 PC

  Flange Check Valve

  Item  Description   Quantity
1 DN 50     1.6 MPA 1 PC

  Flange

  Item  Description   Quantity
1 DN 150      2 PCS
2 DN 100       30 PCS
3 DN 80      1 PC
4 DN 65       2 PCS
5 DN 50       20 PCS
6 DN 40       8 PCS
7 DN 15       1 PC

  Screw Ball Valve

  Item  Description   Quantity
1 DN 40     1.6 MPA 3 PCS
2 DN 15     1.6 MPA 3 PCS
3 DN 20     1.6 MPA 2 PCS

  Movable Joint (Use in Water Pump)

  Item  Description   Quantity
1 DN 40     2 PCS
2 DN 20       1 PC

 Six-Wing Screw (Double-Head)(Use in Water Pump)

  Item  Description   Quantity
1 DN 40      6 PCS
2 DN 20       4 PCS
3 DN 15 2 PCS

  Pressure Gauge

  Item  Description   Quantity
1 Φ 150  0~1.6Mpa 1 PC
2 Φ 150  0~2.5Mpa 1 PC
3  Pressure Gauge Elbow Pipe 2 PCS
4  Three Way Cock   2 pcs

 Graphite Steel Cushion

  Item  Description   Quantity
1 DN 150   6 PCS
2 DN 100     6 PCS
3 DN 80 10 PCS
4 DN 65       6 PCS
5 DN 50       4 PCS
6 DN 40       10 PCS
7 DN 25       20 PCS
8 DN 20       4 PCS
9 DN 15       4 PCS

  Bolt

  Item  Description  Quantity
1 M 20X65 50 Sets
2 M 18X65 50 Sets
3 M 16X60 240 Sets
4 M 16X50 100 Sets
5 M 12X50 100 Sets
6 M 12X40 200 Sets
7 M 10X40 200 Sets
8 M 20X400 (Stone Bolt use for Chimney) 10 Sets

  Seamless Steal Tube

  Item  Description   Quantity
1  Φ 159 12 meter
2  Φ 108 12 meter
3  Φ 57  30 meter
4  Φ 45 6 meter
5  Φ 76 12 meter
6  Φ 22 12 meter

  Elbow  

  Item  Description  Quantity
1  Φ 159 3 PCS
2  Φ 100 3 PCS
3  Φ 76  2 PCS
4  Φ 57 15 PCS
5  Φ 45 4 PCS
6  Φ 22 2 PCS

 Screw Elbow Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   4 PCS
2 DN 20     2 PCS

 Screw Three-way Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   2 PCS

 Asbestos Rope

 Item  Description  Quantity
1  Asbestos  rope 10 Kg

 


Product detail pictures:

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures


Related Product Guide:
Boiler Structure

It adheres for the tenet "Honest, industrious, enterprising, innovative" to develop new products and solutions continuously. It regards shoppers, success as its individual success. Let us produce prosperous future hand in hand for Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings , The product will supply to all over the world, such as: Canberra, Nairobi, Bangalore, With the superior and exceptional service, we are well developed along with our customers. Expertise and know-how ensure that we are always enjoying the trust from our customers in our business activities. "Quality", "honesty" and "service" is our principle. Our loyalty and commitments remain respectfully at your service. Contact Us Today For further information, contact us now.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Monica from French - 2018.11.28 16:25
    This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Brook from Vietnam - 2017.10.23 10:29
    Write your message here and send it to us

    Related products

    • professional factory for Industrial Electric Boiler - SHF Coal Water Slury Steam Boiler – Double Rings

      professional factory for Industrial Electric Bo...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • Manufacturer for Hot Water Pipe - LPG Pressure Tank – Double Rings

      Manufacturer for Hot Water Pipe - LPG Pressure...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Cheap PriceList for Outdoor Coal Boiler - AAC Autoclave and Boiler – Double Rings

      Cheap PriceList for Outdoor Coal Boiler - AAC ...

      Autoclave Characteristics 1 The autoclave is steel horizontal tube-type device, the autoclave lid is pressed by the whole block 16MnR steel, the flange of autoclave body and autoclave lid is used the 16Mn steel in the whole forging processing. The weld parts have been heat treatment and strict nondestructive testing in accordance with relevant standards. 2. Autoclave door is activity Open structure by hand-reducer. The clients can also choice the electric, pneumatic, hydraulic style to ...

    • Factory source Electric Boiler - Boiler Ladder and Stair – Double Rings

      Factory source Electric Boiler - Boiler Ladder...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • New Delivery for Boiler Electrical - Gas oil Boiler Burner – Double Rings

      New Delivery for Boiler Electrical - Gas oil B...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • Factory Cheap Industrial Hot Water Boiler - Biomass Hot Water Boiler – Double Rings

      Factory Cheap Industrial Hot Water Boiler - Bi...

      Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...