Fast delivery Hot Water Pipe - Boiler Water Tank – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Our purpose would be to offer good quality products at competitive price ranges, and top-notch support to clients around the whole world. We're ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for steam boiler water treatment, industial boiler, city oil hot water boiler, We believe we will become a leader in developing and producing high quality products in both Chinese and international markets. We hope to cooperate with more friends for mutual benefits.
Fast delivery Hot Water Pipe - Boiler Water Tank – Double Rings Detail:

Used in Boiler

Tank accessories
(1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top.
When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve.
Generally, there are not less than 2 floating ball valves.
The diameter of the ball float valve is the same as that of the inlet pipe, and each ball float valve shall be equipped with an inspection valve before it.
(2) Outlet pipe: the outlet pipe of the water tank can be connected from the side wall or the bottom.
The bottom of the outlet pipe connected from the side wall or the top surface of the outlet pipe connected from the bottom shall be 50 mm higher than the bottom of the water tank.
The outlet pipe shall be equipped with gate valve.
The inlet and outlet pipes of the water tank should be set separately. When the inlet and outlet pipes are the same pipe, check valve should be installed on the outlet pipe.
When it is necessary to install check valves, swing check valves with less resistance should be used instead of lifting check valves, and the elevation should be more than 1m below the lowest water level of the water tank.
When a water tank is used jointly by life and fire control, the check valve on the fire control outlet pipe should be lower than the pipe top of the domestic water outflow siphon (when the vacuum of the domestic siphon is destroyed when the water is lower than the pipe top, only the water flow out of the fire control outlet pipe is guaranteed at least 2M, so that it has a certain pressure to push the check valve.
When a fire occurs, the fire water reserve can really play a role.
(3) Overflow pipe: the overflow pipe of the water tank can be connected out from the side wall or the bottom, and its pipe diameter shall be determined according to the maximum inlet flow of the discharge tank, and shall be larger than the intake pipe L-2.
Valves shall not be installed on the overflow pipe.
The overflow pipe shall not be directly connected with the drainage system, and indirect drainage shall be adopted. Measures shall be taken on the overflow pipe to prevent the entry of dust, insects, mosquitoes and flies, such as water seal and filter screen, etc.
(4) Drain pipe: the water tank drain pipe should be connected from the lowest part of the bottom.
Drain pipe Figure 2-2N The water tank for fire fighting and living table is equipped with a gate valve (should not be equipped with a cut-off valve), which can be connected with the overflow pipe, but not directly connected with the drainage system.
Drainage pipe diameter generally adopts DN50 when there is no special requirement.
(5) Ventilation pipe: The water tank for drinking water shall be provided with a sealed box cover, and the box cover shall be provided with access hole and ventilation pipe.
Ventilation pipe can be extended to indoor or outdoor, but not to harmful gases. The nozzle should have a filter screen to prevent dust, insects and flies from entering. Generally, the nozzle should be set down.
Ventilation pipe shall not be equipped with valves, water seals and other devices that interfere with ventilation.
Ventilation pipe shall not be connected with drainage system and ventilation duct.
Ventilation pipe generally adopts the diameter of DN50.
(6) Liquid level meter: Generally, glass liquid level meter should be installed on the side wall of the water tank to indicate the water level on the spot.
When the length of one liquid level gauge is insufficient, two or more liquid level gauges can be installed up and down.
The overlap part of two adjacent liquid level gauges should not be less than 70mm, as shown in Figure 2-22.
If there is no liquid level signal timing in the water tank, signal tube can be set to give the overflow signal.
The signal tube is generally connected from the side wall of the water tank, and its height should be set so that the bottom of the tube is level with the bottom of the overflow tube or the overflow water surface of the flared mouth.
Generally, the diameter of the pipe is DNl5 signal pipe, which can be connected to the washbasin, washing basin and other places in the room where there are often people on duty.
If the level of the water tank is interlocked with the water pump, the level relay or signal device shall be installed on the side wall or top cover of the water tank. The commonly used level relay or signal device includes float ball type, pole type, capacitance type and float type, etc.
The high and low electric hanging water level of the water tank with water pump pressure should be considered to maintain a certain safe volume. The maximum electric control water level at the moment of stopping the pump should be 100 mm lower than the overflow water level, while the minimum electric control water level at the moment of starting the pump should be 20mm higher than the design minimum water level, so as to avoid overflow or cavitation caused by error.
(7) Water tank cover, internal and external ladder.
BOILER WATER TANK


Product detail pictures:


Related Product Guide:
Boiler Structure

We now have a skilled, performance team to supply good quality services for our consumer. We often follow the tenet of customer-oriented, details-focused for Fast delivery Hot Water Pipe - Boiler Water Tank – Double Rings , The product will supply to all over the world, such as: Belgium, South Africa, Berlin, We focus on providing service for our clients as a key element in strengthening our long-term relationships. Our continual availability of high grade products in combination with our excellent pre-sale and after-sales service ensures strong competitiveness in an increasingly globalized market. We are willing to cooperate with business friends from at home and abroad and create a great future together.
Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
5 Stars By Alva from Oman - 2017.12.09 14:01
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
5 Stars By Matthew Tobias from Sacramento - 2018.12.10 19:03
Write your message here and send it to us

Related products

  • Diesel Steam Generator Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

    Diesel Steam Generator Boiler - Pellets Shells...

    Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

  • Rapid Delivery for Condensing Gas Boilers - LPG Pressure Tank – Double Rings

    Rapid Delivery for Condensing Gas Boilers - LP...

    Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

  • Top Rated Oil Boilers - Pellets Shells Husk Biomass Boiler – Double Rings

    Top Rated Oil Boilers - Pellets Shells Husk Bi...

    Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

  • Factory Cheap Hot Steam Boiler For Sale - Oil Steam Boiler – Double Rings

    Factory Cheap Hot Steam Boiler For Sale - Oil ...

    Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

  • Wholesale Price Industrial Boiler - Biomass Hot Water Boiler – Double Rings

    Wholesale Price Industrial Boiler - Biomass Ho...

    Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...

  • China Boiler Tube Factory - Boiler Ladder and Stair – Double Rings

    China Boiler Tube Factory - Boiler Ladder and ...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...