Featured
-
China Chain Grate Boilers - Single Drum Hot Water Boiler – Double Rings
Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70 DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ... -
China Biomass Steam Boiler Manufacturer - Boiler Steam Distribution Cylinder – Double Rings
Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin... -
China Lpg Boiler Manufacturer - Gas/Oil Fired Hot Water Boiler – Double Rings
Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ... -
China Biomass Boiler Device - Single Drum Steam Boiler – Double Rings
Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t... -
China Pressure Vessel Manufacturers - Boiler Flue – Double Rings
Used in Boiler Introduction Industrial smoke exhaust, air into the pipe, the pipe is equipped with a damper (valve) to regulate the wind speed and pressure in the pipe. It is composed of furnace wall, partial heating surface pipe and cladding wall pipe to guide the flow of smoke, and through each heating surface for heat exchange, divided into horizontal flue and tail flue. The main smoke duct section size of the large capacity boiler is very large, in order to bear and transfer the loa... -
Boiler Installation Material Factories - Double Drum Hot Water Boiler – Double Rings
Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity 2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption Kg/H ~580 ~900 ~1130 Thermal Efficiency % 78 80 80 Heating Surface Boil... -
2020 wholesale price Industrial Electric Boiler - Electric Steam Boiler – Double Rings
Introduction: Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃ Feature Fully automatic operation can be realized by a digital controller switch Control system selected advanced programmable controller, heating element input sequence can be realized the timing automatically switches to extend component life With automatic sewage With automatic wa... -
China Biomass Fired Boiler Factory - Installation & Technology Service – Double Rings
Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...