Featured

  • OEM/ODM Supplier Oil Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

    OEM/ODM Supplier Oil Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

    Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...
  • Factory wholesale Boiler Wood - Single Drum Hot Water Boiler – Double Rings

    Factory wholesale Boiler Wood - Single Drum Hot Water Boiler – Double Rings

    Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...
  • One of Hottest for Wood Pellet Boiler - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

    One of Hottest for Wood Pellet Boiler - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...
  • Top Suppliers China Oil Boiler - Wood Biomass Boiler – Double Rings

    Top Suppliers China Oil Boiler - Wood Biomass Boiler – Double Rings

    Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory
  • Factory source Coal Fired Boiler - Wood Biomass Boiler – Double Rings

    Factory source Coal Fired Boiler - Wood Biomass Boiler – Double Rings

    Korean Purchased two sets Biomass Boiler Type: DZL 4-1.25-S  ; SZL 10-1.25-S ; Fuel : Wood Chip, Wood ,Plywood chip etc. Usage : Plywood Factory
  • Factory wholesale Oil Condensing Boilers - Gas oil Boiler Economizer – Double Rings

    Factory wholesale Oil Condensing Boilers - Gas oil Boiler Economizer – Double Rings

    More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.
  • Factory Outlets Thermal Oil Boiler - Boiler Electric Control – Double Rings

    Factory Outlets Thermal Oil Boiler - Boiler Electric Control – Double Rings

    More Photos Electric Control Container Overview 2-4T 6T 10T 15T 20T 25T Sheet 1: 2t steam boiler electrical instrument control system configuration (common configuration 1.25Mpa) Features name Specification unit Qty Brand Electrical control           Induced draft fan control 11KW  Star Delta Start  set  1  Zhengtai Blower control  3KW  Direct start  set  1  Grate control  0.55KW  Direct start  set  1  Coal machine control 1.1KW  Direct start  set  1  Slag machine control ...
  • China Supplier Electricity Boiler - Installation & Technology Service – Double Rings

    China Supplier Electricity Boiler - Installation & Technology Service – Double Rings

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...