Sticking to the perception of "Creating products of top of the range and earning mates with people today from all over the world", we constantly put the desire of consumers in the first place for Industrial Boiler, boiler accessory water tank, Gas Fired Boiler, How about to start your good business with our company? We are ready, trained and fulfilled with pride. Let’s start our new business with new wave.
Fixed Competitive Price Heat Boilers - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:


Related Product Guide:
Boiler Structure

We often persist with the theory "Quality To start with, Prestige Supreme". We are fully committed to delivering our clientele with competitively priced good quality items, prompt delivery and experienced support for Fixed Competitive Price Heat Boilers - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Panama, South Africa, Lahore, With the development and enlargement of mass clients abroad, now we have set up cooperative relationships with many major brands. We have our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the "quality first, customer first, We are provideing high-quality, low-cost products and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
5 Stars By Donna from kazakhstan - 2018.04.25 16:46
The customer service staff's answer is very meticulous, the most important is that the product quality is very good, and packaged carefully, shipped quickly!
5 Stars By Karen from Johannesburg - 2017.12.31 14:53
Write your message here and send it to us

Related products

  • Trending Products Boiler System - Double Drum Hot Water Boiler – Double Rings

    Trending Products Boiler System - Double Drum ...

    Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

  • Factory directly Steam Boiler Electric - Gas oil Boiler Economizer – Double Rings

    Factory directly Steam Boiler Electric - Gas o...

    More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

  • Super Lowest Price Lpg Boiler - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

    Super Lowest Price Lpg Boiler - Coal Boiler Bi...

    I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3

  • 2020 China New Design Boiler Accessory - Gas oil Boiler Economizer – Double Rings

    2020 China New Design Boiler Accessory - Gas o...

    More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

  • Factory Free sample Outdoor Coal Boiler – Boiler Valve and Meter – Double Rings

    Factory Free sample Outdoor Coal Boiler –...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

  • OEM/ODM China Industrial Electric Boiler - Boiler Water Pump – Double Rings

    OEM/ODM China Industrial Electric Boiler - Boi...

    Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded