We will make every effort to be outstanding and perfect, and accelerate our steps for standing in the rank of international top-grade and high-tech enterprises for Diesel Steam Boiler, Coal Fired Boiler, lpg steam boiler, "Making the Products of High Quality" is the eternal goal of our company. We make unremitting efforts to realize the goal of "We Will Always Keep in Pace with the Time".
Free sample for Hot Water Heating Boilers - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Free sample for Hot Water Heating Boilers - Installation & Technology Service – Double Rings detail pictures

Free sample for Hot Water Heating Boilers - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

The really abundant projects administration experiences and just one to one particular provider model make the substantial importance of organization communication and our easy understanding of your expectations for Free sample for Hot Water Heating Boilers - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Namibia, Uzbekistan, Danish, Our company has already have pass the ISO standard and we are fully respect our customer 's patents and copyrights. If the customer provides their own designs, We will guarantee that they will be the only one can have that products. We hoping that with our good products can bring our customers a great fortune.
  • Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
    5 Stars By Margaret from Australia - 2018.03.03 13:09
    Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Maggie from Italy - 2017.01.28 19:59
    Write your message here and send it to us

    Related products

    • Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings

      Good quality Boiler In Thermal Power Plant - I...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • China Oil Gas Steam Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      China Oil Gas Steam Boiler - Gas Oil Thermal O...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • Biomass Wood Fired Steam Boiler - Coal Boiler Chain Grate – Double Rings

      Biomass Wood Fired Steam Boiler - Coal Boiler ...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • Online Exporter Boiler Industry - heat recovery boiler – Double Rings

      Online Exporter Boiler Industry - heat recover...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • Manufactur standard Coal Boiler - Coke Boiler – Double Rings

      Manufactur standard Coal Boiler - Coke Boiler ...

      Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

    • Cheap price China Industrial Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings

      Cheap price China Industrial Boiler - Coal Boi...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...