Good Quality Boiler - Double Drum Hot Water Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

The shopper satisfaction is our primary focus on. We uphold a consistent level of professionalism, quality, credibility and repair for Chinese boiler flue, industrial oil boiler, china plg tank, Therefore, we can meet different inquiries from different clients. Please find our website to check more information from our products.
Good Quality Boiler - Double Drum Hot Water Boiler – Double Rings Detail:

Parameter :

SZL Bearing Pressure Hot water Boiler

Main Technology Parameter List

ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII
Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h
Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25
Rated Steam Temp. 115/130 115/130 115/130
Feed Water Temp. 70 70 70
Fuel Consumption  Kg/H ~580 ~900 ~1130
Thermal Efficiency  % 78 80 80
Heating Surface Boiler Body m² 80.5 142 178
Economizer m² 38.5 87.2 122.08
Grate area   m² 4.84 7.78 10.42
Design Fule Bituminous Coal
Max. Transport Weight   30 T ~25T ~26T
Max. Transport Dimension m 6.9×2.5×3.5 Up6.09×3.04×3.6D:7.3×2.86×1.72 6.9×3.33×3.55
Boiler Auxiliary Equipment Model and Specification
Air Blower Model T4-72-11 4ARight 315° T4-72-11 5ARight 225° GC8-1Right 225°
Motor Power N=5.5 Kw N=11 Kw N=11 Kw
Draft Fan Model Y9-26 9DRight 0° Y8-39 9DRight 0° GY8-1Right 0°
Motor Power N=22 Kw N=30 Kw N=37 Kw
Gear Box Model GL-5P GL-10P GL-10P
Motor Power N=0.55 Kw N=1.1Kw N=1.1 Kw
Feed Water Pump Model 1½ GC5x7 2GC-5×5 2GC-5×4
Motor Power N=7.5 Kw N=11 Kw N=11 Kw
Dust Remover XD-4 XD-6 XD-8

 

ModelItem SZL7-1.0/115/70-AIISZL7-1.25/130/70-AII SZL10.5-1.0/115/70-AIISZL10.5-1.25/130/70-AII SZL14-1.0/115/70-AIISZL14-1.25/130/70-AII SZL17.5-1.0/115/70-AIISZL17.5-1.25/130/70-AII
Rated Capacity   7T/h 10.5 T/h 14 T/h 17.5T/h
Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 1.0/1.25
Rated Steam Temp. 115/130 115/130 115/130 115/130
Feed Water Temp. 70 70 70 70
Fuel Consumption  Kg/H ~1400 ~1900 ~2700 ~3650
Thermal Efficiency  % 82 82 82 82
Heating Surface Radiation Tube 39.43 37.21 58.4 58.4/68.4
convection bank 213.4 284.68 307.4 307.4/384.8
Economizer m² 122.08 130.8 413 413/521
Grate area   m² 11.99 17.81 22.56 24.52
Design Fule Bituminous Coal (Low location of heat value:19228Ki/kg)
Max. Transport Weight   ~40 T ~43T ~30T ~30T
Max. Transport Dimension 7.9×3.2×3.5 10×3.2×3.5 11×3.2×3.5 12×3.2×3.54

Product detail pictures:

Good Quality Boiler - Double Drum Hot Water Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We persist with the principle of "quality 1st, assistance initially, continual improvement and innovation to meet the customers" for your management and "zero defect, zero complaints" as the standard objective. To great our service, we present the products and solutions while using the very good top quality at the reasonable cost for Good Quality Boiler - Double Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Hanover, Slovenia, French, Item have passed by means of the national qualified certification and been well received in our main industry. Our expert engineering team will often be ready to serve you for consultation and feedback. We have been able to also deliver you with cost-free samples to meet your specs. Ideal efforts will probably be produced to deliver you the most beneficial service and solutions. Should really you be interested in our company and solutions, please make contact with us by sending us emails or call us straight away. To be able to know our solutions and enterprise. ar more, you'll be able to come to our factory to see it. We will constantly welcome guests from all over the world to our firm. o build business enterprise. elations with us. You should feel absolutely free to speak to us for organization. nd we believe we are going to share the best trading practical experience with all our merchants.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Elizabeth from Brasilia - 2017.07.28 15:46
    The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Nicci Hackner from Australia - 2017.11.29 11:09
    Write your message here and send it to us

    Related products

    • OEM/ODM Factory Natural Gas Steam Boiler - Oil Steam Boiler – Double Rings

      OEM/ODM Factory Natural Gas Steam Boiler - Oil...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • 2020 wholesale price Industrial Electric Boiler - Boiler Ladder and Stair – Double Rings

      2020 wholesale price Industrial Electric Boiler...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Super Lowest Price Oil Fueled Boiler - LPG Pressure Tank – Double Rings

      Super Lowest Price Oil Fueled Boiler - LPG Pre...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Europe style for Oil Combi Boiler - SZS Gas Oil PLG Boiler – Double Rings

      Europe style for Oil Combi Boiler - SZS Gas Oi...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Short Lead Time for Water Tube Boilers - SZS Gas Oil PLG Boiler – Double Rings

      Short Lead Time for Water Tube Boilers - SZS G...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Super Lowest Price Oil Fueled Boiler - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Super Lowest Price Oil Fueled Boiler - Coal Bo...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...