Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

It is a great way to further improve our products and repair. Our mission is always to create innovative products to prospects with a superior expertise for good thermal oil boiler, Coal Fired Furnace, china lpg boiler, If you are interested in any of our items, please don't hesitate to contact us and take the first step to build up a successful business relationship.
Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings detail pictures

Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With advanced technologies and facilities, strict high-quality handle, reasonable rate, superior services and close co-operation with prospects, we are devoted to furnishing the best price for our customers for Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: India, Croatia, Johor, We confirm to public, cooperation, win-win situation as our principle, adhere to the philosophy of make a living by quality, keep developing by honesty , sincerely hope to build up a good relationship with more and more customers and friends, to achieve a win-win situation and common prosperity.
  • Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
    5 Stars By Julia from Philippines - 2017.04.08 14:55
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Princess from St. Petersburg - 2018.09.23 17:37
    Write your message here and send it to us

    Related products

    • New Arrival China Hot Water Boiler - Boiler Ladder and Stair – Double Rings

      New Arrival China Hot Water Boiler - Boiler La...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Original Factory Boiler Price - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Original Factory Boiler Price - Coal Boiler Bi...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Best-Selling Small Boiler - Boiler Tube – Double Rings

      Best-Selling Small Boiler - Boiler Tube –...

      More Photos Boiler Steel Pipe/Tube is a kind of seamless steel pipe. The manufacturing method is the same as seamless steel pipes, but there are strict requirements for the steel grades used to manufacture boiler steel pipes. According to the temperature level, it is divided into two types: low pressure boiler tube and high pressure boiler tube.

    • 2020 Good Quality Electric Boiler - Single Drum Hot Water Boiler – Double Rings

      2020 Good Quality Electric Boiler - Single Dru...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

    • Chinese wholesale Industrial Steam Boilers - Double Drum Steam Boiler – Double Rings

      Chinese wholesale Industrial Steam Boilers - D...

      Coal Steam Boiler-Used in Foods, Textile, Plywood,Paper Brewery,Rice Mill etc.. Introduction : SZL Series assembled water tube boiler adopts longitudinal double drum chain grate boiler. The boiler body is composed of up& down longitudinal drums and convection tube, best heating surface, high thermal efficiency, reasonable design, compact structure, elegant appearance, adequate effect. Two side of Combustion chamber equipped the light pipe water wall tube, up drum equip steam ...

    • Industrial Boiler Ltd Factory - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      Industrial Boiler Ltd Factory - Coal Boiler Bi...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...