It adheres on the tenet "Honest, industrious, enterprising, innovative" to develop new items frequently. It regards buyers, success as its very own success. Let us produce prosperous future hand in hand for chinese coke boiler, Biomass Fired Boiler, chinese boiler technology, We sincerely welcome domestic and foreign merchants who calls, letters asking, or to plants to negotiate, we will offer you quality products and the most enthusiastic service,We look forward to your visit and your cooperation.
High Quality Electric Boiler - Pressure Vessel – Double Rings Detail:

Introduction:

Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc.
Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing.
In addition, also equipped with safety devices, meter and safety internals for protection purpose .
Pressure Vessel Main Performance Parameter List
Steam Pressure1.0Mpa
Inlet Temperature 250℃
Saturation Temperature 179℃
Heating Water:Inlet Temperature 90℃;
Outlet Temperature 140℃

Parameter

PW=1.6Mpa Liquified Petroleum Gas Horizontal Tank

Rated Capacity m3

5

10

20

24

30

50

100

Geometric Volume m3

5.03

10.02

21.20

24.31

30.08 50.04 100.23
Max.Filling Capacity  T

2.19

4.37

9.26

10.64

13.12

21.39

43.70

Diameter mm

1200

1600

2000

2000

2200

2600

3000

Length  mm

4670

5270

7100

8270

8310

9820

14720

Equipment Weight  Kg

1890

3410

6100

6800

8700

12300

25100

Pressure Vessel Main Performance Parameter List

Steam Pressure1.0Mpa

Inlet Temperature 250℃

Saturation Temperature 179℃

Heating Water:Inlet Temperature 90℃;

Outlet Temperature 140℃

ModelItem BH400-6-QS BH500-13-QS BH600-20-QS BH800-36-QS BH1000-83-QS
Specification Diameter   mm

400

500

600

800

1000

Area    m2

6

13

20

36

83
Length   m

1.5

2.0

2.0

2.0

2.5

Tube

28

48

72

130

240

Tube side Number

2

2

2

2

2

Heating Water Drum Number

6

6

6

6

6

Flow  T/h

19.6

46.4

71.93

129.36

318.45

Flow Rate m/s

0.27

0.37

0.38

0.38

0.51

Force Loss   Mpa

0.21×10-3

0.44×10-3

0.47×10-3

0.46×10-3

0.91×10-3

Drum(Steam) Flow T/h

2.05

4.86

7.54

13.56

33.38

Heat Transfer performance  Heat transfer m2/

3120

3410

3437

3434

3667

Capacity  MW

1.15

2.72

4.22

7.58

18.63

  Equipment Weight Kg

450

800

1000

2100

3000


Product detail pictures:

High Quality Electric Boiler - Pressure Vessel – Double Rings detail pictures

High Quality Electric Boiler - Pressure Vessel – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our enterprise since its inception, constantly regards product good quality as organization life, constantly improve production technology, strengthen merchandise high quality and continuously strengthen enterprise total good quality administration, in strict accordance with all the national standard ISO 9001:2000 for High Quality Electric Boiler - Pressure Vessel – Double Rings , The product will supply to all over the world, such as: Cape Town, America, kazan, We always stick to the tenet of "sincerity, high quality, high efficiency, innovation". With years of efforts, we have established friendly and stable business relationships with worldwide customers. We welcome any of your inquiries and concerns for our products, and we are sure that we will offer just what you want, as we always believe that your satisfaction is our success.
  • The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Nicole from Turkmenistan - 2017.03.07 13:42
    Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Iris from America - 2018.06.18 17:25
    Write your message here and send it to us

    Related products

    • Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings

      Massive Selection for Biomass Boiler Cost - In...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Factory wholesale Boiler Wood - Gas oil Boiler Burner – Double Rings

      Factory wholesale Boiler Wood - Gas oil Boiler...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • OEM/ODM China New Boiler - Coal Boiler Economizer – Double Rings

      OEM/ODM China New Boiler - Coal Boiler Economi...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • PriceList for Hot Water Pipe - Coal Boiler Economizer – Double Rings

      PriceList for Hot Water Pipe - Coal Boiler Eco...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • factory customized Outdoor Coal Boiler - Gas/Oil Fired Hot Water Boiler – Double Rings

      factory customized Outdoor Coal Boiler - Gas/O...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • Horizontal Autoclave Factory - Gas oil Boiler Economizer – Double Rings

      Horizontal Autoclave Factory - Gas oil Boiler ...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.