Manufactur standard Coal Boiler - Coke Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We normally think and practice corresponding towards the change of circumstance, and grow up. We aim at the achievement of a richer mind and body plus the living for bulk boiler, gas boiler installation material, chinese gas hot water boiler, Welcome throughout the world buyers to speak to us for organization and long-term cooperation. We're going to be your reliable partner and supplier.
Manufactur standard Coal Boiler - Coke Boiler – Double Rings Detail:

Instruction

DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined with efficient water film dust collector make the ash to meet the requirements of Class A.

The series coking boiler can reach the environmental effects of the gas boiler by burning bituminous coal cost , environmental protection and energy saving.

Parameter :

DZH Coking coil boiler

Main Technology Parameter List

Model DZH1-0.7-T  DZH2-1.25 DZH4-1.25-T DZH6-1.25-T DZH8-1.25-T DZH10-1.25-T
Rated Capacity   1 T/h 2 T/h 4 T/h 6 T/h 8 T/h 10 T/h
Rated Working Pressure 0.7 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa 1.25 Mpa
Rated Steam Temp. 171 194 194 194 194 194
Feed Water Temp. 20
Heating Surface Boiler Body  25.27 33.85 76 142 160 207
Economizer  17.7 35.4 59 87.2 122.08 140
Grate area   m² 1.97 2.68 3.97 6.9 7.4 9.2
Design Fule Metallurgical coke ,foundry coke I II
Fuel Consumption  Kg/H ~120 ~230 ~475 ~665
Thermal Efficiency  % 76 78 78 78 79 80
Max. Transport Weight   ~9 T ~14.5T ~21T ~25T ~30T ~20T
Max. Transport Dimension 3.95×1.9×2.6 4.2×2.7×3.0 5.8×2.8×3.2 6.57×2.75×3.45 7.1×3.2×3.5 7.6×3.2×3.5
Finished boiler size m 3.95×1.9×2.68 4.2×2.9×4.2 5.8×3.5×4.4 6.6x3x3.6 7.2x4x4.2 7.7×4.1×4.5
Boiler Auxiliary Equipment Model and Specification
Air Blower Model Y6-30-12Left 90° YX-9-35Left 90° YX9-35Right 0° GY6-1Right 0° 10TYRight 0° 10TYRight 0°
Motor Power N=4 Kw N=7.5 Kw N=18.5 Kw N=30 Kw N=45 Kw N=45 Kw
Draft Fan Model T4-72   Right 0° T4-72   Right 315° T4-72   Right 315° GG6-1Right 225° 10TGRight 225° 10TGRight 225°
Motor Power N=1.1 Kw N=2.2 Kw N=5.5 Kw N=7.5 Kw N=14 Kw N=15 Kw
Feed Water Pump Model W vortex 1½ GC5x7 1½ GC5x7 DG6-25×6 DG12-25×6 DG12-25×7
Motor Power N=3 Kw N=7.5 Kw N=7.5 Kw N=7.5 Kw N=11 Kw N=15 Kw
Dust Remover Water Film Dust Remover

Product detail pictures:

Manufactur standard Coal Boiler - Coke Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

To be a result of ours specialty and repair consciousness, our corporation has won an excellent reputation amongst customers all around the entire world for Manufactur standard Coal Boiler - Coke Boiler – Double Rings , The product will supply to all over the world, such as: Milan, Malawi, Malawi, With the first-class solutions, excellent service, fast delivery and the best price, we've won highly praise foreign customers'. Our products have been exported to Africa, the Middle East, Southeast Asia and other regions.
  • This is a very professional wholesaler, we always come to their company for procurement, good quality and cheap.
    5 Stars By Iris from Lithuania - 2017.02.14 13:19
    As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
    5 Stars By Andrea from panama - 2018.06.19 10:42
    Write your message here and send it to us

    Related products

    • Best Price on Industrial Biomass Boiler - Vertical Gas Oil Boiler – Double Rings

      Best Price on Industrial Biomass Boiler - Vert...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

    • OEM/ODM Manufacturer Gas Fired Boiler - Boiler Water Pump – Double Rings

      OEM/ODM Manufacturer Gas Fired Boiler - Boiler...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • Quality Inspection for Steam Boiler Electric - Pressure Vessel – Double Rings

      Quality Inspection for Steam Boiler Electric -...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Low MOQ for Hot Water Heating Boilers - Installation & Technology Service – Double Rings

      Low MOQ for Hot Water Heating Boilers - Instal...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Reliable Supplier Biomass Boiler Cost - Boiler Water Pump – Double Rings

      Reliable Supplier Biomass Boiler Cost - Boiler...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • China Steam Tube Manufacturers - Pellets Shells Husk Biomass Boiler – Double Rings

      China Steam Tube Manufacturers - Pellets Shell...

      Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...