Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Bear "Customer first, High quality first" in mind, we perform closely with our consumers and provide them with efficient and experienced services for China Industrial Boiler, coke fired boiler, hot oil boilerchina thermal oil boiler, We welcome you to join us in this path of creating a prosperous and efficient business together.
Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings detail pictures

Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With dependable high quality approach, great reputation and excellent customer support, the series of products and solutions produced by our firm are exported to lots of countries and regions for Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Lesotho, Qatar, Nigeria, All the imported machines effectively control and guarantee the machining precision for the items. Besides, we have a group of high-quality management personnels and professionals, who make the high-quality items and have the ability to develop new merchandise to expand our market home and abroad. We sincerely expect customers come for a blooming business for both of us.
  • As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Carol from Nigeria - 2017.06.16 18:23
    Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
    5 Stars By Dale from Bolivia - 2017.09.22 11:32
    Write your message here and send it to us

    Related products

    • Factory Cheap Hot Steam Boiler For Sale - Single Drum Hot Water Boiler – Double Rings

      Factory Cheap Hot Steam Boiler For Sale - Sing...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

    • Wholesale Industry Boiler - Pressure Vessel – Double Rings

      Wholesale Industry Boiler - Pressure Vessel &#...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Good quality Boiler In Thermal Power Plant - Single Drum Hot Water Boiler – Double Rings

      Good quality Boiler In Thermal Power Plant - S...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

    • Wholesale High Pressure Boiler Tube - Gas Oil Thermal Oil Boiler – Double Rings

      Wholesale High Pressure Boiler Tube - Gas Oil ...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • China OEM Natural Gas Hot Water Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings

      China OEM Natural Gas Hot Water Boiler - Coal ...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • OEM/ODM Supplier Hot Water Pipe - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      OEM/ODM Supplier Hot Water Pipe - Coal Boiler ...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...