New Fashion Design for Commercial Biomass Boilers - Boiler Sample Cooling Collection – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Sticking for the principle of "Super Quality, Satisfactory service" ,We have been striving for being a superb small business partner of you for heavy oil hot water boiler, industial boiler, boiler fan, We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
New Fashion Design for Commercial Biomass Boilers - Boiler Sample Cooling Collection – Double Rings Detail:

Used in Boiler

Sampling Cooler 
This entry was reviewed by the “Popular Science China” science encyclopedia entry compilation and application project.
An instrument used for sampling and cooling of soda-water samples in a boiler room or power plant.
The sampling cooler comprises a cooling water tank, an inlet pipe, a flange cover, a outlet pipe, a busbar and a plurality of cooling coils;
It can effectively improve the accuracy of water quality analysis, and at the same time the connecting point between the equipment is simple.
 
Structure
Connected with flange cover the top of the cooling water tank is equipped with coil pipe mouth of the flange cover with holes, in the middle of the cooling coil set in cooling water in the box, the outlet and inlet end of the cooling coil respectively through Kong Yanshen to cooling water tank, among them, the entry of the cooling coil and connected to the boiler, the export of cooling coil, directly above the bus slot of the water in the cooling coil by cooling coil exports into confluence worse, bus slot connected at the bottom of the drain;
The bottom of the cooling water tank is provided with a water inlet, the outlet of the water inlet pipe is connected with the water inlet of the cooling water tank;
The top of the cooling water tank is also provided with an outlet, and the inlet of the outlet pipe is connected with the outlet of the cooling water tank .
 
Principle
Sampling cooler used for boiler room or soda assay sample cooling power station, the water in the boiler and heating system mostly higher temperature, and high temperature is not convenient to sampling, also not easy to determine, in the sample should be cool, so let’s introduce the sample of sampling point sampling cooler for cooling, general requirements to ensure traffic in the 500-700 ml/min, the sample can take a 30 to 40 degrees cold, satisfy the People’s Republic of China power industry DL/T 457-91 standard.
 
Characteristics 
The sampling cooler is suitable for sampling medium such as liquid and gas with high temperature. It has the advantages of compact structure, high heat transfer efficiency, convenient cleaning and long service life.
 
Specifications
1: The sampler tube is stainless steel and the housing is carbon steel.
2. Generally, the sampling cooling pipe can be welded and flange with diameter of 10, 12, 14, 16 and 18mm (or optionally specified by the user). The cooling water interface is DN25 with external thread.
3: The general types are qYl-159/0.32, QYl-219/0.40 and QYl-273/0.54.
4: Whether to combine (that is, whether to support, water tank, valve, etc..
 
Sampling procedure
1.Boiler water sampling
The boiler water sample is generally taken out of the continuous drain pipe of the drum and sent to the cooler.
The sampling point should be as close as possible to the outlet of the drain line drain drum and as far as possible before the first drain valve behind the drain drum.2.Sampling of feed water
The sampling point of the water supply is generally set after the feed pump, and a small pipe should be connected to the vertical pipe line of the water supply pipe on the high-pressure feed pipe before the economizer, from which the sample of the water supply is led to the sampling cooler.
The sampling tube of the feed water should be located at a place where the feed water can be mixed after dosing.
3.Sampling of condensed water
The condensate water sampling point is generally located in the condensate water pipe at the outlet of the condensate pump, should not be installed in the condensate pump entrance, because the pressure of the condensate pump entrance is lower than atmospheric pressure.
4.Hydrophobic sampling
The drainage is generally sampled in the drainage tank.
The sampling point is usually located about 300mm away from the bottom of the drain tank.
Steam samples are condensed into water through the sampling cooler.
The steam flow rate in the steam sampler is generally 20-30kg/h.
The requirements for the sample lead – out duct and cooler are the same as for water sampling.by metal corrosion products in the tubes during sampling.
 
Attention
Stainless steel tubes shall be used for sampling. Carbon steel tubes or brass tubes shall not be used to avoid contamination of the samples by metal corrosion products in the tubes during sampling.
sampling


Product detail pictures:

New Fashion Design for Commercial Biomass Boilers - Boiler Sample Cooling Collection – Double Rings detail pictures

New Fashion Design for Commercial Biomass Boilers - Boiler Sample Cooling Collection – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for New Fashion Design for Commercial Biomass Boilers - Boiler Sample Cooling Collection – Double Rings , The product will supply to all over the world, such as: Lithuania, California, Dominica, With the growing of the company, now our products sold and served at more than 15 countries around the world,such as Europe,North America,Middle-east,South America,Southern Asia and so on. As we bear in our mind that innovation is essential to our growth, new product development is constantly.Besides, Our flexible and efficient operation strategies,High quality products and competitive prices are exactly what our customers are looking for. Also a considerable service brings us good credit reputation.
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Joanne from Singapore - 2018.09.12 17:18
    Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Eve from Qatar - 2018.12.11 11:26
    Write your message here and send it to us

    Related products

    • Fixed Competitive Price Heat Boilers - Coal Boiler Biomass Boiler Chimney – Double Rings

      Fixed Competitive Price Heat Boilers - Coal Bo...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • Dzl Biomass Steam Boiler Pricelist - Coal Boiler Chain Grate – Double Rings

      Dzl Biomass Steam Boiler Pricelist - Coal Boil...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • Factory wholesale Outdoor Coal Boiler - Boiler Installation Material – Double Rings

      Factory wholesale Outdoor Coal Boiler - Boiler...

      Used in Boiler DZL 6-1.25-AII STEAM BOILER Installation Material List   Flange Stop Valve   Item  Description   Quantity 1 DN 150    1.6 MPA 1 PC 2 DN 100    1.6 MPA 1 PC 3 DN 80     1.6 MPA 1 PC 4 DN 65     1.6 MPA 2 PCS 5 DN 50     1.6 MPA 3 PCS 6 DN 40     1.6 MPA 1 PC 7 DN 15     1.6 MPA 1 PC   Flange Check Valve   Item  Description   Quantity 1 DN 50     1.6 MPA 1 PC   Flange   Item  Description   Quantity 1 DN 150      2 PCS 2 DN 100       3...

    • Chinese wholesale Industrial Steam Boilers - Installation & Technology Service – Double Rings

      Chinese wholesale Industrial Steam Boilers - I...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Personlized Products Outdoor Coal Boiler - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Personlized Products Outdoor Coal Boiler - Coa...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • China Gold Supplier for Boiler Manufacturing - Coal Boiler Chain Grate – Double Rings

      China Gold Supplier for Boiler Manufacturing -...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.