When our boiler with capacity beyond 2T , the boiler body will pack by 40FR .
The Boiler body will be fixed by the Iron Rod and stable, after packing well, it will be packed by Rainproof .
Please check the Photos of the packing and rainproof.
Post time: Aug-20-2021