Waste Heat Boiler Daily Maintenance

Daily maintenance

1. Observe the water level with a water level meter, and repair the damaged water level meter in time;

2. The pressure gauge is damaged and the dial is unclear and replaced in time;

3. Valves that run, leak, drip or leak can be repaired or replaced in time;

4. The insulation layer and the reinforced inner lining layer are intact.

5. Every shift should check the flexibility and working conditions of the transmission device regularly, and lubricate it in time to ensure its normal operation;

6. Check and repair fans, water supply pipeline valves, water supply pumps, etc.;

7. Check all connecting pipe flanges and other parts of the boiler system must be tight and not leaking;

8. If the induced draft fan vibrates severely, it should be stopped for inspection. Generally, it is caused by the wear of the internal impeller and should be replaced;

9. Water should not accumulate on the ground and heated pipes at the bottom of the boiler header to prevent moisture from corroding the base;

10. Regularly check the shaft end seal of the three-way flapper valve, the operation of the main shaft and the electric device, and troubleshoot in time;

11. Frequently check whether the boiler steam pressure, water level, superheated steam output and temperature are normal;

12. Check all foundation anchor bolts for looseness. It must be tightened, otherwise it will cause vibration;

13. The water level gauge must be flushed once per shift;

14. Safety valve manual steam or water discharge experiment at least once a week, and automatic steam or water discharge experiment at least once every three months;

15. Flush the pressure gauge once a week during normal operation, and check the water trap at least once every six months; draw a red line indicating the working pressure on the dial, and seal it after calibration;

16. High and low water level alarms, low water level interlocking devices, overpressure, overtemperature alarms, overpressure interlocking devices, at least one alarm interlocking test per month;

17. Equipment repair and maintenance and safety accessories test and verification conditions should be recorded in detail, and boiler operation management personnel should conduct random checks on a regular basis.

 