Our enterprise insists all along the standard policy of "product high-quality is base of business survival; client satisfaction could be the staring point and ending of an business; persistent improvement is eternal pursuit of staff" as well as consistent purpose of "reputation first, client first" for boiler accessory electric control panel, chinese pressure vessel, China Biomass Boiler, For further queries or should you have any question regarding our products, please do not hesitate to contact us.
OEM/ODM China Industrial Electric Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

OEM/ODM China Industrial Electric Boiler - Installation & Technology Service – Double Rings detail pictures

OEM/ODM China Industrial Electric Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for OEM/ODM China Industrial Electric Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Manila, Guyana, Belgium, We have now 48 provincial agencies in the country. We also have stable cooperation with several international trading companies. They place order with us and export solutions to other countries. We expect to cooperate with you to develop a larger market.
  • The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
    5 Stars By Martha from Malta - 2018.09.19 18:37
    Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Yannick Vergoz from Florida - 2018.05.22 12:13
    Write your message here and send it to us

    Related products

    • China Water Tube Boiler Factory - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      China Water Tube Boiler Factory - Coal Boiler ...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...

    • Hot Sale for Biomass Steam Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

      Hot Sale for Biomass Steam Boiler - Pellets Sh...

      Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

    • Factory Supply High Pressure Steam Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

      Factory Supply High Pressure Steam Boiler - Pe...

      Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

    • China Biomass Boiler - Pressure Vessel – Double Rings

      China Biomass Boiler - Pressure Vessel –...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Leading Manufacturer for Bosch Boiler - Installation & Technology Service – Double Rings

      Leading Manufacturer for Bosch Boiler - Instal...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Well-designed Biomass Pellet Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

      Well-designed Biomass Pellet Boiler - Pellets ...

      Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...