We purpose to understand high quality disfigurement with the output and supply the top service to domestic and overseas buyers wholeheartedly for power plant heat recovery boiler, steam boiler tube, Industrial Boilers Manufacturers, Our hugely specialized process eliminates the component failure and offers our consumers unvarying high quality, allowing us to control cost, plan capacity and maintain consistent on time delivery.
OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings detail pictures

OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Gaining customer satisfaction is our company's aim forever. We will make great efforts to develop new and top-quality products, meet your special requirements and provide you with pre-sale, on-sale and after-sale services for OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: America, Nepal, Zimbabwe, Now, we professionally supplies customers with our main products And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Pandora from Rotterdam - 2018.02.04 14:13
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Hellyngton Sato from Brasilia - 2018.12.05 13:53
    Write your message here and send it to us

    Related products

    • professional factory for Industrial Electric Boiler - SHF Coal Water Slury Steam Boiler – Double Rings

      professional factory for Industrial Electric Bo...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings

      Short Lead Time for Water Tube Boilers - Insta...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Special Price for Hot Oil Boiler - Single Drum Steam Boiler – Double Rings

      Special Price for Hot Oil Boiler - Single Drum...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

    • Low MOQ for Hot Water Heating Boilers - Boiler Water Treatment – Double Rings

      Low MOQ for Hot Water Heating Boilers - Boiler...

      More photos 1. Quartz sand filter — mainly used for the removal of sediment from water. 2. Active Carbon filter– mainly used for chlorine removal and other organic gases and to clear up the taste of water . 3. Water Softener– exchange “ions” of calcium and magnesium with the most common and easiest method. 4. Precision filter– mainly used for removing microorganisms,chlorine,part of the heavy metal ions more precisely 5. High pressure pump– Provi...

    • High Quality for Oil Steam Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

      High Quality for Oil Steam Boiler - Coal Boile...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • Wholesale Industry Boiler - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

      Wholesale Industry Boiler - Coal Boiler Biomas...

      I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3