One of Hottest for Wood Pellet Boiler - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We not only will try our greatest to offer you excellent services to each individual client, but also are ready to receive any suggestion offered by our buyers for boiler accessories, Commercial Biomass Boilers, boiler gas flue, Accurate process devices, Advanced Injection Molding Equipment, Equipment assembly line, labs and software advancement are our distinguishing feature.
One of Hottest for Wood Pellet Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

One of Hottest for Wood Pellet Boiler - Installation & Technology Service – Double Rings detail pictures

One of Hottest for Wood Pellet Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Responsible excellent and fantastic credit rating standing are our principles, which will help us at a top-ranking position. Adhering towards the tenet of "quality initial, buyer supreme" for One of Hottest for Wood Pellet Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Sweden, Istanbul, Provence, We are increasingly expanding our international market share based on quality products, excellent service, reasonable price and timely delivery. Please contact us at any time for more information.
  • Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
    5 Stars By Beulah from Greece - 2017.10.13 10:47
    The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Marco from Benin - 2017.03.07 13:42
    Write your message here and send it to us

    Related products

    • Cheapest Price Biomass Boiler Cost - Double Drum Hot Water Boiler – Double Rings

      Cheapest Price Biomass Boiler Cost - Double Dr...

      Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

    • Chinese Professional Gas Steam Boiler - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      Chinese Professional Gas Steam Boiler - Well-d...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • OEM/ODM China New Boiler - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      OEM/ODM China New Boiler - Coal Boiler Biomass...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Diesel Steam Boiler Supplier - SHL Bulk Industrial Boiler – Double Rings

      Diesel Steam Boiler Supplier - SHL Bulk Indust...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • factory customized Outdoor Coal Boiler - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      factory customized Outdoor Coal Boiler - Coal ...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • China Gas Boiler Hot Water - Coal Boiler Biomass Boiler F.D.Fan – Double Rings

      China Gas Boiler Hot Water - Coal Boiler Bioma...

      FD Fan used in Coal Boiler Industrial centrifugal blower fan is used for steam boilers, which has good quality and high efficiency. According to your requirements, we can provide technical solution and technical solution. Below industrial blower fan picture for your reference.