Original Factory Biomass Fired Boiler - Boiler Ladder and Stair – Double Rings
Original Factory Biomass Fired Boiler - Boiler Ladder and Stair – Double Rings Detail:
Quality Control
1 | Strength Calculation Report for Applied Materials after Inspection Machine inspected. |
2 | 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; |
3 | 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; |
4 | Hydraulic test report:ensure the standard working pressure and safety; |
5 | Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province |
6 | Manufacturer Produce Level Grade-A. Product Reach European Standard CE Marks. |
Product detail pictures:
Related Product Guide:
Boiler Structure
We've our have sales staff, style and design staff, technical crew, QC team and package workforce. We've strict excellent control procedures for each system. Also, all of our workers are experienced in printing field for Original Factory Biomass Fired Boiler - Boiler Ladder and Stair – Double Rings , The product will supply to all over the world, such as: Bolivia, Venezuela, Washington, We've been proud to supply our products and solutions to every auto fan all around the world with our flexible, fast efficient services and strictest quality control standard which has always approved and praised by customers.
By Ina from Dubai - 2018.09.21 11:01
The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
By Daisy from Morocco - 2017.05.02 11:33
Write your message here and send it to us