Power Plant Biomass Steam Boiler - Vertical Gas Oil Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Well-run equipment, professional sales team, and better after-sales services; We are also a unified big family, everyone stick to the company value "unification, dedication, tolerance" for dissel burner, Steam Pipe, china gas hot water boiler, Our company has already set up a professional, creative and responsible team to develop clients with the multi-win principle.
Power Plant Biomass Steam Boiler - Vertical Gas Oil Boiler – Double Rings Detail:

Introduction :

1. Compact structure, small installation area, easy to install.
2. Good heating surface , low exhaust gas temperature
3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency
4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water .
5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing heating.
6. Small dust emission to achieve the requirements of the national environmental safety.

Steam Boiler Parameter

LHS Vertical Steam Boiler burning oil or gas

Main Technology Parameter List

ModelItem LHS0.1-0.4-YQLHS0.1-0.7-YQ   LHS0.2-0.4-YQLHS0.2-0.7-YQ LHS0.3-0.4-YQLHS0.3-0.7-YQ LHS0.5-0.4-YQLHS0.5-0.7-YQ LHS0.7-0.4-YQLHS0.7-0.7-YQ LHS1-0.4-YQLHS1-0.7-YQLHS1-1.0-YQ
Rated Capacity  T/h

0.1  

0.2  

0.3  

0.5 

0.7 

1.0  

Rated Working Pressure

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

Rated Steam Temp.

152/170

151.8/170

151.8/170

151.8/170

151.8/170

151.8/170/183

Feed Water Temp.

20

Heating Surface

2.3

4.34

6.53

12.05

20.93

25.48

Installed Overall Dimension 

1.26×1.25×1.97

1.456×1.35×2.07

1.91×1.68×2.475

2.15×1.9×2.735

1.54×2.3×2.855

2.963×2.35×3.07

Boiler Weight  Ton

1

1.15

1.67

2.57

2.96

4.03

Water Pump Model

JGGC  0.6-8

JGGC  0.6-8

JGGC  0.6-8

JGGC  0.6-12

JGGC  0.6-12

JGGC  2-10

Chimney mm

Ø 150

Ø 150

Ø 200

Ø 200

Ø 300

Ø 300

Thermal Efficiency  %

83

83

83

83

83

83

Design Fuel

Light Oil/Town Gas/Natural Gas

Burner Brand`

Italy RIELLO Burner G20S

Ringelmann shade 

< Grade 1

Hot Water Boiler Parameter

Atmospheric Pressure Hot Water Boiler burning gas or oil

Main Parameter List

Model

Item

CLHS0.21-95/

70-Y(Q)

 

CLHS0.35-95/

70-Y(Q)

 

CLHS0.5-95/

70-Y(Q)

 

CLHS0.7-95/

70-Y(Q)

 

CLHS1.05-95/

70-Y(Q)

 

CLHS1.4-95/

70-Y(Q)

 

Rated Thermal Power MW

0.21

0.35

0.5

0.7

1.05

1.4

Rated Outlet Water Temp. 

95

Rated Return Water Temp. 

20

Design Fuel

Heavy oil/0# Light Diesel oil/ Natural Gas

Heating Surface    

10.5

12.6

15

16.5

22

35.6

Design Thermal efficiency

83%

Heating Area    

1800

3000

4300

6000

9000

12000

Boiler Body Specification mm

Ø1164×2040

Ø1164×2550

Ø1264×2550

Ø1364×2360

Ø1468×2590

Ø1568×2830

Boiler Weight  Ton

1.7

1.9

2.5

3.0

3.1

3.8

Dust emission

<  100 mg/Nm3

Ringelmann shade

< Grade 1


Product detail pictures:

Power Plant Biomass Steam Boiler - Vertical Gas Oil Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

"Sincerity, Innovation, Rigorousness, and Efficiency" would be the persistent conception of our corporation to the long-term to establish collectively with customers for mutual reciprocity and mutual benefit for Power Plant Biomass Steam Boiler - Vertical Gas Oil Boiler – Double Rings , The product will supply to all over the world, such as: Riyadh, Serbia, Iceland, We always stick to the tenet of "sincerity, high quality, high efficiency, innovation". With years of efforts, we have established friendly and stable business relationships with worldwide customers. We welcome any of your inquiries and concerns for our products, and we are sure that we will offer just what you want, as we always believe that your satisfaction is our success.
  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Pag from Russia - 2017.12.31 14:53
    We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Fay from Ukraine - 2017.02.18 15:54
    Write your message here and send it to us

    Related products

    • Special Design for Heating Water Boiler - Gas oil Boiler Burner – Double Rings

      Special Design for Heating Water Boiler - Gas ...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • Wholesale Industry Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      Wholesale Industry Boiler - Gas Oil Thermal Oi...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • China Electricity Boiler - Coke Boiler – Double Rings

      China Electricity Boiler - Coke Boiler –...

      Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

    • Hot New Products Diesel Boiler - Steam&Hot Water Pipe – Double Rings

      Hot New Products Diesel Boiler - Steam&Hot...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • Discount wholesale Heat Boilers - Gas oil Boiler Burner – Double Rings

      Discount wholesale Heat Boilers - Gas oil Boil...

      More photos •Single stage operation(on/off). •Air-gas mixing at blast-pipe. •Ability to obtain optimal combustion values by regulating combustion air and blast-pipe. •Maintenance facilitated by the fact that the atomisation unit can be removed without having to remove the burner from the boiler. •Single stage manual flow adjustment •Sliding/modulating The servo motor which fixed with a cam can adjust the consumption for fuel and air. •One flange and one insulating seal for boiler fasten...

    • Chinese wholesale Natural Gas Steam Boiler - Installation & Technology Service – Double Rings

      Chinese wholesale Natural Gas Steam Boiler - I...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...