PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

While in the past few years, our organization absorbed and digested innovative technologies both equally at home and abroad. Meanwhile, our organization staffs a group of experts devoted for the advancement of boiler auxiliary chimney, husk steam boiler, natural gas hot water boiler, In a word, when you choose us, you choose a perfect life. Welcome to visit our factory and welcome your order! For further inquiries, please do not hesitate to contact us.
PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings Detail:

Used in Boiler

DZL 6-1.25-AII STEAM BOILER Installation Material List

  Flange Stop Valve

  Item  Description   Quantity
1 DN 150    1.6 MPA 1 PC
2 DN 100    1.6 MPA 1 PC
3 DN 80     1.6 MPA 1 PC
4 DN 65     1.6 MPA 2 PCS
5 DN 50     1.6 MPA 3 PCS
6 DN 40     1.6 MPA 1 PC
7 DN 15     1.6 MPA 1 PC

  Flange Check Valve

  Item  Description   Quantity
1 DN 50     1.6 MPA 1 PC

  Flange

  Item  Description   Quantity
1 DN 150      2 PCS
2 DN 100       30 PCS
3 DN 80      1 PC
4 DN 65       2 PCS
5 DN 50       20 PCS
6 DN 40       8 PCS
7 DN 15       1 PC

  Screw Ball Valve

  Item  Description   Quantity
1 DN 40     1.6 MPA 3 PCS
2 DN 15     1.6 MPA 3 PCS
3 DN 20     1.6 MPA 2 PCS

  Movable Joint (Use in Water Pump)

  Item  Description   Quantity
1 DN 40     2 PCS
2 DN 20       1 PC

 Six-Wing Screw (Double-Head)(Use in Water Pump)

  Item  Description   Quantity
1 DN 40      6 PCS
2 DN 20       4 PCS
3 DN 15 2 PCS

  Pressure Gauge

  Item  Description   Quantity
1 Φ 150  0~1.6Mpa 1 PC
2 Φ 150  0~2.5Mpa 1 PC
3  Pressure Gauge Elbow Pipe 2 PCS
4  Three Way Cock   2 pcs

 Graphite Steel Cushion

  Item  Description   Quantity
1 DN 150   6 PCS
2 DN 100     6 PCS
3 DN 80 10 PCS
4 DN 65       6 PCS
5 DN 50       4 PCS
6 DN 40       10 PCS
7 DN 25       20 PCS
8 DN 20       4 PCS
9 DN 15       4 PCS

  Bolt

  Item  Description  Quantity
1 M 20X65 50 Sets
2 M 18X65 50 Sets
3 M 16X60 240 Sets
4 M 16X50 100 Sets
5 M 12X50 100 Sets
6 M 12X40 200 Sets
7 M 10X40 200 Sets
8 M 20X400 (Stone Bolt use for Chimney) 10 Sets

  Seamless Steal Tube

  Item  Description   Quantity
1  Φ 159 12 meter
2  Φ 108 12 meter
3  Φ 57  30 meter
4  Φ 45 6 meter
5  Φ 76 12 meter
6  Φ 22 12 meter

  Elbow  

  Item  Description  Quantity
1  Φ 159 3 PCS
2  Φ 100 3 PCS
3  Φ 76  2 PCS
4  Φ 57 15 PCS
5  Φ 45 4 PCS
6  Φ 22 2 PCS

 Screw Elbow Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   4 PCS
2 DN 20     2 PCS

 Screw Three-way Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   2 PCS

 Asbestos Rope

 Item  Description  Quantity
1  Asbestos  rope 10 Kg

 


Product detail pictures:

PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings detail pictures

PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings detail pictures

PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings detail pictures

PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings detail pictures


Related Product Guide:
Boiler Structure

It truly is our responsibility to fulfill your requirements and successfully provide you. Your fulfillment is our best reward. We're seeking forward in your check out for joint development for PriceList for Industrial Water Boiler - Boiler Installation Material – Double Rings , The product will supply to all over the world, such as: Armenia, Pakistan, Argentina, Each customer's satisfactory is our goal. We are looking for long-term cooperation with each customer. To meet this, we keep up our quality and provide extraordinary customer service. Welcome to our company, we are expecting to cooperate with you.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Athena from London - 2017.10.23 10:29
    We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Kama from Guatemala - 2017.11.20 15:58
    Write your message here and send it to us

    Related products

    • Bottom price New Boiler Deals - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      Bottom price New Boiler Deals - Well-designed ...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Bottom price Industrial Hot Water Boiler - Boiler Steam Distribution Cylinder – Double Rings

      Bottom price Industrial Hot Water Boiler - Boi...

      Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin...

    • Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings

      Short Lead Time for Water Tube Boilers - Insta...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • China Cheap price Biomass Boiler - DHL Corner Tube Bulk Water Pipe Boiler – Double Rings

      China Cheap price Biomass Boiler - DHL Corner ...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • China Hot Oil Boiler Manufacturers - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      China Hot Oil Boiler Manufacturers - Well-desi...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • China Factory for Boiler Operating - Autoclave and Boiler – Double Rings

      China Factory for Boiler Operating - Autoclave...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...