Professional China Water Tube Boiler - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

With our rich experience and considerate services, we have been recognized as a reliable supplier for many international buyers for Condensing Gas Boilers, Boiler Installation Material, Gas Boiler Hot Water, Our merchandise are widely recognized and dependable by users and can meet continuously building economic and social needs.
Professional China Water Tube Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Professional China Water Tube Boiler - Installation & Technology Service – Double Rings detail pictures

Professional China Water Tube Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We know that we only thrive if we can guarantee our combined rate competiveness and good quality advantageous at the same time for Professional China Water Tube Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Iran, Vietnam, Qatar, We have more than 8 years of experience in this industry and have a good reputation in this field. Our products have won praise from customers worldwide. Our aim is to help customers realize their goals. We are making great efforts to achieve this win-win situation and sincerely welcome you to join us.
  • The factory technical staff not only have high level of technology, their English level is also very good, this is a great help to technology communication.
    5 Stars By Olive from America - 2017.12.02 14:11
    As an international trading company, we have numerous partners, but about your company, I just want to say, you are really good, wide range, good quality, reasonable prices, warm and thoughtful service, advanced technology and equipment and workers have professional training, feedback and product update is timely, in short, this is a very pleasant cooperation, and we look forward to the next cooperation!
    5 Stars By Alma from Somalia - 2017.02.28 14:19
    Write your message here and send it to us

    Related products

    • High reputation Oil Boiler - Boiler Water Treatment – Double Rings

      High reputation Oil Boiler - Boiler Water Trea...

      More photos 1. Quartz sand filter — mainly used for the removal of sediment from water. 2. Active Carbon filter– mainly used for chlorine removal and other organic gases and to clear up the taste of water . 3. Water Softener– exchange “ions” of calcium and magnesium with the most common and easiest method. 4. Precision filter– mainly used for removing microorganisms,chlorine,part of the heavy metal ions more precisely 5. High pressure pump– Provi...

    • OEM/ODM Manufacturer Gas Fired Boiler - heat recovery boiler – Double Rings

      OEM/ODM Manufacturer Gas Fired Boiler - heat r...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • 2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings

      2019 China New Design Steam Boiler Price - Ins...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • China Biomass Steam Boiler Suppliers - Coal Boiler Biomass Boiler Chimney – Double Rings

      China Biomass Steam Boiler Suppliers - Coal Bo...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • Hot Oil Boiler Suppliers - Autoclave and Boiler – Double Rings

      Hot Oil Boiler Suppliers - Autoclave and Boile...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...

    • Wholesale Price Steam Tube - Biomass Steam Boiler – Double Rings

      Wholesale Price Steam Tube - Biomass Steam Boi...

      Biomass Boiler-Hot Sale- Easy Installation Low Heating Value Fuel Wood Rice Husk Pellets etc. Introduction : Biomass Steam Boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to ...