Professional Design Thermal Oil Boiler - SZS Gas Oil PLG Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We have been experienced manufacturer. Wining the majority of your crucial certifications of its market for boiler auxiliary slag remover, Boilers Oil Fired, Industrial Boiler, We believe in quality over quantity. Before export of the hair there is strict quality control check during treatment as per international quality standards.
Professional Design Thermal Oil Boiler - SZS Gas Oil PLG Boiler – Double Rings Detail:

Introduction :

SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the convection bank tube. The rear part of convection tube bank is a tube-reducing staggered structure,
and the front part is aligned structure. The flue gas generated from furnace combustion flows from furnace rear outlet to the end of combustion chamber, convection tube bank area, amt then turns from the front-left of furnace to the spiral finned tube energy saver, and finally flows into ducting and through chimney emits to atmosphere.

Feature:

1. Due to combustion chamber applying whole membrane water cooling structure.and adopted micro–positive pressure combustion, there is no smoke leakage, and there is no pollution in operation environment;
2. There are explosion door and flame sensor in the boiler arrangement and so operation is safe and reliable;
3. At boiler rear, it adopts the spiral finned tube type energy saver that reduces flue gas emission temperature and therefore raises thermal efficiency. The design efficiency is above 92%;
4.The boiler is horizontal arrangement in compact structure with small floor space area;
5.The manholes are arranged at the two ends of upper and lower drums, and check door is set a rear part of boiler. These openings make users easy for entering inside doing maintenance and cleaning work;
6. The boiler is wholly assembled for delivery, easy for transportation and shortened for installation period;
7.The boiler achieves fully automatic control. It has the functions of automatic running and protection with easy operation.


Product detail pictures:


Related Product Guide:
Boiler Structure

We have our own sales team, design team, technical team, QC team and package team. We have strict quality control procedures for each process. Also, all of our workers are experienced in printing field for Professional Design Thermal Oil Boiler - SZS Gas Oil PLG Boiler – Double Rings , The product will supply to all over the world, such as: Ukraine, Montreal, Benin, As an experienced manufacturer we also accept customized order and we could make it the same as your picture or sample specification. The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
5 Stars By Jacqueline from Croatia - 2017.07.28 15:46
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
5 Stars By Carlos from Algeria - 2017.07.28 15:46
Write your message here and send it to us

Related products

  • China Outdoor Coal Boiler Factory - Pressure Vessel – Double Rings

    China Outdoor Coal Boiler Factory - Pressure V...

    Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

  • Low price for Hot Oil Boiler - heat recovery boiler – Double Rings

    Low price for Hot Oil Boiler - heat recovery b...

    Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

  • Lowest Price for Wood Chip Boiler - Biomass Steam Boiler – Double Rings

    Lowest Price for Wood Chip Boiler - Biomass St...

    Biomass Boiler-Hot Sale- Easy Installation Low Heating Value Fuel Wood Rice Husk Pellets etc. Introduction : Biomass Steam Boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to ...

  • Ordinary Discount Boilers Suppliers - Single Drum Hot Water Boiler – Double Rings

    Ordinary Discount Boilers Suppliers - Single D...

    Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

  • China Boiler Wood Factory - Installation & Technology Service – Double Rings

    China Boiler Wood Factory - Installation &...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

  • 8 Year Exporter Oil Boiler - Pressure Vessel – Double Rings

    8 Year Exporter Oil Boiler - Pressure Vessel &...

    Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...