professional factory for Boiler Installation Material – Coal Boiler Economizer – Double Rings
professional factory for Boiler Installation Material – Coal Boiler Economizer – Double Rings Detail:
Quality Control
1 | Strength Calculation Report for Applied Materials after Inspection Machine inspected. |
2 | 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; |
3 | 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; |
4 | Hydraulic test report:ensure the standard working pressure and safety; |
5 | Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province |
6 | Manufacturer Produce Level Grade-A. Product Reach European Standard CE Marks. |
Product detail pictures:
Related Product Guide:
Boiler Structure
Being supported by an highly developed and skilled IT group, we could offer you technical support on pre-sales & after-sales support for professional factory for Boiler Installation Material – Coal Boiler Economizer – Double Rings , The product will supply to all over the world, such as: Norway, India, Jordan, Being the top solutions of our factory, our solutions series have been tested and won us experienced authority certifications. For additional parameters and item list details, please click the button to acquire additional nformation.
By Lydia from Tunisia - 2018.09.16 11:31
The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
By Dee Lopez from Manila - 2018.05.15 10:52
Write your message here and send it to us